TEST AND CHECKOUT PRECEDURES AND TROUBLESHOOTING
CAUTIONS
1. DISCONNECT THE POWER SUPPLY CORD FROM THE OUTLET WHENEVER REMOVING THE OUTER CASE
FROM THE UNIT.PROCEED WITH THE TEST ONLY AFTER DISCHARGING THE HIGH VOLTAGE CAPACITOR
AND REMOVING THE LEAD WIRES FROM THE PRIMARY WINDING OF THE HIGH VOLTAGE TRANSFORMER.
2. ALL OPERATIONAL CHECKS WITH MICROWAVE ENERGY MUST BE DONE WITH A LOAD (1 LITER OF
WATER IN CONTAINER)IN THE OVEN.
A. TEST PROCEDURES
COMPONENTS
TRANSFORMER
MAGNETRON
Copyright © 2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
TEST PROCEDURES
FILAMENT
WINDING
1. Remove wire leads.
2. Measure resistance. (ohm meter scale: Rx1)
• Primary winding
• Secondary winding
• Filament winding
3. Measure resistance. (ohm meter scale: Rx1000)
• Primary winding to ground
• Filament winding to ground
1. Remove wire leads. Install the magnetron seal
in the correct position. Check that the seal is in
good condition.
2. Measure resistance. (ohm meter scale: Rx1)
• Filament terminal
3. Measure resistance. (ohm meter scale: Rx1000)
• Filament to chassis
7-15
SECONDARY
WINDING
PRIMARY
WINDING
Antenna
Gasket
Chassis
Filament
RESULTS
Approx. 0.3 to 0.5 ohm.
Approx. 65 to 120 ohm.
0 ohm.
Normal: Infinite