System Start-Up; Making The System Operational; Check And Correct The Operating Pressure; Checking The Operating Pressure - Bosch Thermotechnology Buderus Logano G615 Operating Instructions Manual

Low-temperature oil/gas boiler
Table of Contents

Advertisement

3

System start-up

3
System start-up
This chapter explains how you prepare the system for
operation and how to commission the control panel and
the burner.
3.1

Making the system operational

You should check the following to prepare the system for
operation:
B Operating pressure of the system (
B Fuel is supplied and the main fuel shut-off valve is open
B Heating system emergency shutoff switch set to ON
Ask your heating contractor to show you where the fill
valve for your heating system (boiler return) is located.
3.2
Check and correct the operating
pressure
Your heating system must contain sufficient water to
ensure the functionality of your system.
NOTICE: Risk of system damage due to
frequent topping up.
B If you need to add water frequently, the
heating system may be damaged by
corrosion and scale buildup depending on
the water quality.
B Bleed the heating system. If necessary,
top up heating water.
B Check the heating system for leaks and
the correct operation of the expansion
vessel.
B Notify your heating contractor if you find
you need to top up your heating system
frequently.
If the operating pressure in the system is too low, fill make-
up water into your system (
• Recently added fill or make-up water loses much of its
volume in the first few days because it releases gases.
With newly filled heating systems, initially check the
operating pressure daily and then in ever increasing
intervals.
Air pockets may form in the heating system
from the fill or make-up water releasing
gases.
• Once the system is barely losing any volume, check the
operating pressure of the heating water once a month.
8
Chapter 3.2)
Chapter 2.3, page 6).
Logano G615 - We reserve the right to make technical changes without notice!
All factory default settings will have already been made by
the heating contractor when the system was first
commissioned.
3.2.1

Checking the operating pressure

The operating pressure must be at least 15 psi (1 bar).
B Read the current operating pressure and temperature
(°F (°C)) from the temperature/pressure gauge.
B If the operating pressure drops below 15 psi (1 bar),
top up heating water.
Fig. 3
Pressure/temperature gauge
3.2.2
Topping up with heating water and bleeding
the system
Let your local heating contractor show you
where the boiler fill and drain valve for
topping up and draining the heating water is
located on your heating system.
B Slowly fill the heating system via the on-site fill valve.
During filling, observe the display (pressure gauge).
B Once the desired operating pressure is reached, stop
the procedure.
B Bleed the heating system via the central purging
station.
B Top up with water again if the operating pressure drops
as a result of bleeding the system.
7 747 019 141-17.1RS

Advertisement

Table of Contents
loading

Related Products for Bosch Thermotechnology Buderus Logano G615

Table of Contents