Pellet boiler

Advertisement

Quick Links

A.D. METALNA INDUSTRIJA VRANJE
1 Radnicka Str
PELLET BOILER
Grande 37 Lux
Instruction for use, maintenance and installation
This product meets the requirements of the Ecodesign Directive in terms of efficiency and air pollution level, in
order to contribute to the reduction of energy consumption and negative environmental impact.
ENG_V.1.0
1612037

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grande 37 Lux and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Alfa Plam Grande 37 Lux

  • Page 1 A.D. METALNA INDUSTRIJA VRANJE 1 Radnicka Str PELLET BOILER Grande 37 Lux Instruction for use, maintenance and installation This product meets the requirements of the Ecodesign Directive in terms of efficiency and air pollution level, in order to contribute to the reduction of energy consumption and negative environmental impact.
  • Page 2 Printing, translation or reproduction, as well as partial, of these instructions is only possible with the written permission of Alfa Plam. The boiler uses pellets as fuel. It operates automatically by dosing the pellet with a helical worm conveyor from the pellet tank, which is part of the device placed above the boiler part of the appliance.
  • Page 3: Table Of Contents

    10.5. Possible problems and solutions ....................18 INFORMATION ON BOILER DISPOSAL ....................20 TECHNICAL CHARACTERISTICS OF THE GRANDE 37 LUX PELLET BOILER ........20 GRANDE 37 LUX BOILER DIMENSIONS....................21 GRANDE 37 Lux PELLET BOILER HYDRAULIC INSTALLATION DIAGRAM ........... 22 14.1.
  • Page 4: Purpose Of The Instruction

    If you lose the Instruction, you can request a new copy from the manufacturer or an authorized vendor. 2. MANUFACTURER’S RESPONSIBILITY By delivering this Instruction, Alfa Plam a.d. disclaims any criminal or penal liability for direct or indirect causing of: ...
  • Page 5: Installer's Responsibility

    Threaded rods Figure.1 Moving the boiler with the bracket CAUTION GATHER ALL PACKAGING MATERIAL AND KEEP IT AWAY FROM THE REACH OF CHILDREN. PARTS OF PACKAGING MATERIAL (BAGS, FOILS, STYRENE, ETC) REPRESENT A CHOKING HAZARD. 2.5. INSTALLER’S RESPONSIBILITY The responsibility of the installer is to verify the correctness of installation, air supply and all the conditions that are required for the installation of pellet boiler.
  • Page 6: Flue Gas Exhaust

    Figure 2: Minimum distance of the boiler from the walls If the pellet boiler is installed in a boiler room with other devices that take in air (other boilers, various types of suction fans, etc.), make sure that the volume of air entering the room is sufficient to guarantee safe operation of the boiler. If the flue passes through the ceiling it must be sufficiently insulated with coating of non-flammable insulation material.
  • Page 7 CAUTION The flue should be earthed in accordance with the applicable regulations. (Earthing is legally defined and regulated.) The earthing should be independent of the heating appliance. When it comes to the dimensions and material, the flue pipe must meet the SPRS 9615-9731 and SRPS 10683 – EN1856- 1 standards.
  • Page 8 In any case, make sure that the length of the initial vertical part of the flue pipe is at least 1.5 meters. Proper exhaust of flue gases is guaranteed in this way only. Figure 7 AISI 316 steel flue with double insulated chamber, material Waterproof flue with double insulated chamber and outer resistant to 400 °...
  • Page 9: Air Supply

    Flue – position and distance 3.3. AIR SUPPLY The combustion air must be supplied to the room with the boiler. The room must be continuously aired. The fresh air opening must be at the bottom of the room and must let in the air. A) Combustion air supply by pipeline through basements.
  • Page 10: Non-Return Valve

    The boiler connections are 1". So the non-return valve should be 1", or larger.  The warranty shall be void if the non-return valve is not installed!  The non-return valve installation diagram is as follows: 1. Grande 37 Lux boiler, 2. Circulation pump, 3. Non-return valve 4.1. MIXING VALVE Firstly, the reduced thermal power of the boiler will be used due to the high thermal power of the boiler, it is necessary to fit the hydro installation with a built-in three-way mixing valve to avoid condensation of the boiler.
  • Page 11: First Boiler Commissioning

    5. FIRST BOILER COMMISSIONING The first boiler commissioning must be performed exclusively by an authorized person, otherwise the warranty becomes invalid. INSTRUCTIONS FOR THE SAFETY OF PERSONS, ANIMALS OR PROPERTY We want to draw attention of installers to some procedures to be followed so that proper installing of pellet boilers could be guaranteed.
  • Page 12: Instructions For Safe Boiler Starting And Safe Cleaning

    max. length: 30 mm moisture content: do 10% firewood value: min. 16.9 MJ/kg, or 4.7 kWh/kg ash content: below 0.7%  DO NOT use the boiler for burning waste.  Always make sure there is maximum safety. 7. INSTRUCTIONS FOR SAFE BOILER STARTING AND SAFE CLEANING DO NOT use heating oil, kerosene or similar derivatives and other flammable liquids to start the boiler.
  • Page 13: Inspection And Components Needing Maintenance

    The flue pipe, the flue and the flue cap should be inspected and cleaned annually. To carry out the procedure professionally, you should contact a chimneysweeper. 7.3. ADDITIONAL MAINTENANCE Your pellet boiler is a source of heat for which only pellet may be used. Annual boiler maintenance can only be performed by a person authorized by Alfa Plam a.d.
  • Page 14: Important Safety Information

    Regular annual service will preserve proper operation of the heating appliance, ensure its greater efficiency, keep the warranty valid and extend the life of the appliance itself. It is recommended to carry out the procedures described in the previous section at the end of the heating season. The purpose is to inspect and ensure proper operation of all components.
  • Page 15: Electrical Connection Diagram

    10.1. Electrical connection diagram YELLOW- GREEN POWER CABLE FLUE GAS FAN TURBULATOR REDUCER MICRO-SWITCH 1 PRIMARY AIR FAN MICRO-SWITCH 2 LIGTER AUGER REDUCER THERMOMETER MANOMETER FLUE GAS ENCODER PENDULUM REDUCER WATER BOILER PROBE PUMP AUGER MOTOR- REDUCER ENCODER FLUE GAS PROBE AIR FLOW K400 DISPLAY SENSOR...
  • Page 16 The screen display changes by swiping the finger horizontally across the screen. Display 2/2 provides information on the work of certain components connected to the controller, by having the certain connector element icon light green when the element is in function, and not lighting up, i.e. staying black when the element is inactive.
  • Page 17: Menu

    When there is a system error, the top right corner shows the error code and symbol ! Pressing this section of the screen will open the error window. If the system works without problems, the top right corner will show the symbol Error (alarm) Error (alarm) description code...
  • Page 18: On/Off Menu

    1 0 . 3 . 1 . O N / O F F M e n u The ON/OFF menu enables the user to turn the appliance on or off by swiping the finger over the field (shown below), while displaying the current appliance operating mode. 1 0 .
  • Page 19: Information Menu

    Temperature Unit – This option selects the temperature display in degrees Celsius (°C) or Fahrenheit (°F). 1 0 . 3 . 4 . 2 . S e r v i c e The service menu provides various information about system conditions. Counters –...
  • Page 20: Chrono Menu

    1 0 . 3 . 6 . C h r o n o M e n u This menu is used for setting the on/off time, i.e. the programmed boiler operation for precisely defined time periods. The possible modes are daily, weekly and weekend mode. The selected mode appears in the upper left corner of the screen, and the modes themselves or their times are changed by clicking on the pen below the mode name.
  • Page 21: Possible Problems And Solutions

    expires, the phase is interrupted and the next phase – the stabilization phase starts. The igniter, the auger and the flue gases motor are active during this phase. Stabilization The stabilization phase is a transitional state between the ignition phase and the run mode phase. This phase starts when the conditions for ignition are met or when flue gases reach the temperature of 45°C.
  • Page 22 Wrong flue installation Contact the service Faulty manometer Er03 Shutting down due to the low flue Poor combustion (too much Wait for the boiler to turn Check the gases temperature or too little of pellet remains in off and then start the size of the the firebox) system from the ON/OFF...
  • Page 23: Information On Boiler Disposal

    Contact the service NOTE: If the recommended solution fails to remove the direct cause of the alarm, CONTACT ALFA PLAM CALL CENTER or the closest authorized service. INFORMATION ON BOILER DISPOSAL Disposal of the boiler and its removal (as waste material) is the responsibility of the owner of the boiler.
  • Page 24: Grande 37 Lux Boiler Dimensions

    Waterside resistance at rated power (mbar) at 10K Waterside resistance at reduced power (mbar) at 10K Minimum return water temperature at the boiler inlet (°C) Boiler noise emission measured according to EN15036-1 standard (dB) GRANDE 37 LUX BOILER DIMENSIONS Figure 15...
  • Page 25: Grande 37 Lux Pellet Boiler Hydraulic Installation Diagram

    GRANDE 37 Lux PELLET BOILER HYDRAULIC INSTALLATION DIAGRAM In order to reduce the risk of condensation, install a three-way mixing valve with a pipe thermostat when installing the boiler. 14.1. Pellet boiler hydraulic installation diagram (radiator heating ) Legend: 1. Pellet boiler 2.
  • Page 26: Pellet Boiler Hydraulic Installation Diagram (Accumulation Tank)

    14.3. Pellet boiler hydraulic installation diagram (accumulation tank ) Legend: 1. Pellet boiler 2. Air vent 3. Safety valve 3 bar 4. Air vent 5. Circulation pump 6. Three-way mixing valve with pipe thermostat 7. Accumulation tank (BUFFER) 8. Expansion vessel...