Site Preparation Checklist - HP Latex Plus Site Preparation Manual

Hide thumbs Also See for Latex Plus:
Table of Contents

Advertisement

3

Site preparation checklist

Safety requirements
Do those who will operate the equipment have the technical training and
experience necessary to be aware of hazards to which they may be exposed in
performing a task, and to take appropriate measures to minimize the risks?
Is there an emergency exit in the print production area, with easy access and free
from any obstruction?
Electrical installation requirements
Is the single-phase line voltage inside the specified voltage range, 100–240 V?
Has a branch circuit breaker (2 poles, 16 A/20 A general) been correctly installed?
Is the Power Distribution Unit (PDU) correctly installed?
Is the grounding conductor properly installed for the wall receptacle (wall socket)?
Is the wall receptacle (wall socket) suitable for the power cord plug type provided
by HP?
Are the wall receptacle (wall socket) and electrical installation suitable for the
equipment's rated current ?
NOTE:
See Table 2-4 for specific information.
Is the wall receptacle (wall socket) placed close enough to the equipment that the
plug can be plugged and unplugged easily?
NOTE:
See Table 2-5 for specific information.
Electrical configuration requirements
Do you need an Uninterrupted Power Supply (UPS) or step-up transformer? If so, is
it correctly installed?
Networking and computer requirements
Is the RIP computer and software ready for installation?
Have network connections been supplied?
Do you need a web proxy? If so, write down proxy server name and port.
Do you have a LAN cable long enough to connect the cutter to the network?
10
Chapter 3 Site preparation checklist
Yes
No
(Required)
Yes
No
(Required)
Specify nominal mains voltage:
(Required)
(Required)
(Required)
(Required)
(Required)
(Required)
Yes
No
Yes
No
Comments
Comments
Comments
Comments
ENWW

Advertisement

Table of Contents
loading

Table of Contents