Return The Site Preparation Checklist; Electrical Configuration; Single-Phase Power; Circuit Breakers - HP Latex Plus Site Preparation Manual

Hide thumbs Also See for Latex Plus:
Table of Contents

Advertisement

consult with your IT provider on how to configure Internet access. If you can connect to the site, you can check
the browser settings for proxy configuration as follows:
For Internet Explorer, go to Tools > Internet options > Connections > LAN settings. In the proxy server
section of the window, if the Use a proxy server box is unchecked, you do not need a web proxy. If it is
checked, make a note of the Address and Port settings in the main window, or in the HTTP part of the
Advanced settings window.
For Safari, go to Preferences > Advanced > Proxies > Change settings. If the Web proxy (HTTP) box is
unchecked, you do not need a web proxy. If it is checked, make a note of the web proxy server name
(before the ":") and port (after the ":").
Proxy server names are typically similar to "proxy.mycompany.com" and proxy port is typically 80, but
details are network dependent.
If you are unable to determine whether you need a web proxy or how to configure it, please consult with your
network administrator or Internet Service Provider. When in doubt, you probably do not need a web proxy.

Return the site preparation checklist

The checklist must be completed and returned to your reseller or service representative a minimum of two
weeks before the day of installation.
NOTE:
Any delays during installation that are caused by an unprepared site will be charged to the customer.
Take care that your site is properly prepared to ensure a smooth and easy installation.

Electrical configuration

NOTE:
If configuration of the building electrical system used to power the equipment needs to be modified to
meet equipment requirements, an electrician is required. Make sure that your electrician is appropriately certified
according to local regulations and supplied with all the information regarding the electrical configuration.
Your equipment requires the following electrical components to be supplied and installed by the customer,
according to the Electrical Code requirements of the local jurisdiction of the country where the equipment is
installed.

Single-phase power

Table 2-4
Single-phase line specifications
Number of power cords
Input voltage
Input frequency
Maximum load current

Circuit breakers

The circuit breakers must meet the requirements of the equipment and shall be in accordance with the Electrical
Code requirements of the local jurisdiction of the country where the equipment is installed.
The Power Distribution Unit (PDU) must be rated to meet the power requirements of the cutter, and shall be in
accordance with the Electrical Code requirements of the local jurisdiction of the country where the equipment is
installed.
WARNING!
Do not use a power strip (relocatable power tap) to connect both power cords.
ENWW
1
100–240 V
50 / 60 Hz
2 A
Return the site preparation checklist