Box Installation; Factory-Supplied Accessories - Hitachi CH-Box Installation Manual

For cooling / heating change-over box
Table of Contents

Advertisement

4.
CH-Box Installation
● Do not install the CH-Box in a flammable
environment to avoid fire or an explosion.
● Check to ensure that the ceiling slab is strong
enough.
● Do not install the CH-Box outdoors.
If installed outdoors, an electric hazard or
electric leakage may occur.
● Installation WARNING: Ensure that all safety
features, disconnects and interlocks are
in place and functioning properly prior to
putting the equipment into operation. Never
by-pass or jump-out any safety device or
switch.
No.
Accessory
ID f12.7 (1/2)
(1)
Flaring
f15.88 (5/8)
ID f6.35 (1/4)
(2)
Flaring
f9.52 (3/8)
Accessory
Pipe
ID f19.05 (3/4)
(3)
Flaring
f15.88 (5/8)
ID f22.2 (7/8)
(4)
Flaring
f15.88 (5/8)
ID f26
(5)
(1)
Insulation
Material
ID f35
(6)
(1-3/8)
(7)
Clamp
P5417025-rev.1
Table 4.1 Factory-Supplied Accessories
CH-AP04MSSX
CH-AP08MSSX
Q'ty
JCH-AP04MSSX
JCH-AP08MSSX
4
4
2
Flare Nut
Flare Nut
1
Flare Nut
Flare Nut
4
4
17
4.1 Factory-Supplied Accessories
Check to ensure that the following accessories are
packed with the CH-Box.
NOTE
If any of these accessories are not packed with the
unit, please contact your distributor.
CH-AP12MSSX
Q'ty
JCH-AP12MSSX
8
8
2
Flare Nut
2
Flare Nut
8
8
34
Unit: mm (inch)
CH-AP16MSSX
Q'ty
Q'ty
JCH-AP16MSSX
12
16
12
16
2
2
Flare Nut
2
2
Flare Nut
12
16
12
16
51
68
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents