Operation - Glacier bay HD67084W-6010H Installation And Care Manual

Oswell 8 in. widespread 2-handle high-arc bathroom faucet
Table of Contents

Advertisement

Available languages

Available languages

Operation

1
Flushing and checking for leaks
IMPORTANT: After installation is complete, remove the
aerator from the faucet (A) to ush the water lines. Do not
lose the gasket (1) in the aerator.
Ensure the faucet (A) handles are in the off
position and turn on the water supply to check
for leaks. If you discover any leaks, check your
connections to ensure they are installed properly.
Remove the aerator and housing (if applicable).
Turn on the hot and cold handles to allow the
water to run for at least one minute. This
ushes away any debris that could cause
damage to internal parts.
Turn off the water and reinstall the aerator and
housing (if applicable).
2
Removing the quick connector
If it is necessary to remove the quick connector
(1), squeeze the tabs (2) on the quick connector
and then pull down to disconnect.
1
Squeeze
1
7
Please contact 1-855-HD-GLACIER for further assistance.
A
2
Pull
down
1
HOMEDEPOT.COM/GLACIERBAY

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents