Mitsubishi Electric PZ-62DR-E Instruction Book page 49

Lossnay remote controller
Hide thumbs Also See for PZ-62DR-E:
Table of Contents

Advertisement

Run time
You can check the powered time and fan operation time of the product.
Button operation
1
Commissioning menu
Restriction
Error information
Error history
Run time
Maintenance interval
Main menu:
Cursor
F1
2
Total run time
Total powered time
Main menu:
F1
2/2
Page
F2
F3
F4
Run time
Loading
Run time
8776 hour
1752
hour
F2
F3
F4
Accessing the «Run time» screen
Press the
and
Press the
button to go to the next screen.
The product data is loaded before the screen
will appear. [Loading] is displayed. (10 to 60
seconds)
Indication of Run time
Press the
button to return to the previous
screen.
[Total run time]: Fan operation time.
[Total powered time]: Product powered time.
Eng-49
button to move the cursor.
P

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents