Removing The Optical Engine (Assembly) - Epson EH-TW2900 Service Manual

Hide thumbs Also See for EH-TW2900:
Table of Contents

Advertisement

EH-TW3500/4500/5500

3.3.9 Removing the Optical Engine (assembly)

Standard Operation Time
15 Min.
Do not disassemble the Optical Engine more than necessary.
To prevent causing damage to the Optical Engine; when removing it, make
sure to hold the two locations shown below and lift it straight upwards.
SEIKO EPSON
Disassembly and Assembly
Positions to hold
Screw to remove
1.
Remove the Lamp.
(p.55)
2.
Remove the Side Cover L/Side Cover R.
3.
Remove the Upper Case (assembly).
4.
Remove the MA Board (assembly).
5.
Remove the DR Board (EH-TW4500/5500 series only).
6.
Remove the screw that secures the GND cable (1) (EH-TW4500/5500 series only).
7.
Remove the four screws and remove the Optical Engine (assembly).
8.
Remove the screw and remove the Shade Sheet.
9.
Remove the Projection Lens Sheet from the Optical Engine (assembly).
75
CONFIDENTIAL
(p.57)
(p.59)
(p.68)
(p.73)
Revision A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eh-tw3500Eh-tw4400Eh-tw4500Eh-tw5500

Table of Contents