1.Make sure the ground flat and firm before installing, avoid the ground subsidence and cause the
greenhouse to tilt.
2. If you need to permanently install without moving, please use solid bricks and concrete to make the
building foundation, make the house stronger.
3. Additional ground anchors or expansion screws required for different floors are required to be purchased
by the user, and this product is not provided.
Brick
Earth
48
203
24
48
12
24
Use of Wells(Pouring concrete after inserting
309
ground anchor)
After the construction of the Civil Foundation,
it needs to be dry for 3-5 days. Then the
greenhouse components can be placed on
the Civil Foundation.
48
309
48
48
100
48
-4-
Installation instructions and illustrations
Well
24cm
≥5cm
Concrete
48
203
48
24
12
24
763cm
L=L
950cm
158
48
100
48
551cm
1.Before installation, you need to know the meaning of the following symbols.
2.Follow the pattern to install faster and less effort.
Screw tightening State
Unit:cm
Ratio: 1:80
looser
50cm
Loose
6cm
Installation process Perspective
Parallel on
both sides
tight
tighter
F6 Screw Installation Method
1. Install 8mm Sleeve
2. Start the first layer clockwise
3. Rotate counterclockwise for 3 seconds.
4. Fight clockwise to the end
5. Not too tight to ensure that the profile can
not be deformed.
Vertical
Upright
Silicon
It need to be punched.
Ø3mm
Reserved screws
Components, preloaded