Download Print this page

Evergreen ZA720 Assembly Instructions Manual page 3

24x17ft

Advertisement

PRODUCT SIZE
Firstly, make sure a good installation location.
Find a flat ground which is 2 times bigger than the Green house before installation.
OTHER CAUTIONS
1. 3-4 people required, one is for measuring & taking
marks to ensure the installation dimension ,the second
person is responsible for the installation and the last
one do as assistant and assure the safety.
2. High-power electric tools are required, ensure the
normal work of them and highly pay\attention to electric
safety.
3. Be careful when using the kind of blunt tools, like
!
hammer.
4. Wearing long sleeve cotton overalls,gloves and
helmet
during installation and wea safety glasses when using
power tools.
5.No up watching when working height, or the drop
screws may hurt your eyes and suffocation causing
accide
ntally when fall into your mouth.
6. No climbing, No standing on the tent to avoid falling
down.
7. If injuries immediately, using the first-aid kit to stop
bleeding,bind up, In case of emergency , taken
immediately to a nearby medical institutions.
-3-

Advertisement

loading