Download Print this page
Zamp Solar CAP1001 Quick Start Manual

Zamp Solar CAP1001 Quick Start Manual

2 port atp roof cap

Advertisement

Quick Links

2 PORT ATP ROOF CAP MOUNTING
QUICK START GUIDE
TOOLS NEEDED
– Drill
– 1" hole saw
– #2 Phillips Head Screwdriver
– Step drill bit
– Razor Blade
– 3/16" Drill bit
– Wire Strippers
STEP 1: PICK A LOCATION AND METHOD OF CABLE ENTRY
A. Ensure no solar panels are connected to the
roof cap at this time.
B. Identify best location to install roof cap. No
more than 10 linear feet from Charge Controller.
C. If wiring through roof, continue with steps D-G.
D. Using a step drill bit, knock out the plastic
circle in the bottom of the roof cap as shown in
FIGURE: 1.
E. Drill through the roof using the 1" hole saw.
F. Deburr hole if sharp edges exist.
G. Ensure wires do not make contact to sides of
newly drilled hole.
*Zamp Solar recommends using a 1" grommet to
protect the wiring from abrasion.
*Optional wire routing is available through the
knockouts located on the sides of the roof cap.
¾" NPT Cable glands are recommended to protect
wire sheathing.
STEP 2: ROOF CAP MOUNTING OPTIONS
Option 1: Mount with Screws
1. Using a 3/16" drill bit, drill holes through the base of the roof cap in the mounting hole
locations you intend to use. [FIGURE: 1]
2. Liberally apply Self-leveling sealant to the bottom of the roof cap.
3. Mount the roof cap to the roof of the vehicle with provided fasteners.
4. Allow time for sealant to fully cure
ZampSolar.com
CONTENTS
A. 2 Port ATP Roof Cap (CAP1001)
B. ATP Receptacle Boot
C. VHB Tape
D. Roof Cap Mounting screws
NOT INCLUDED
– Solar Wire Harness (6 AWG recommended)
– Self-Leveling Adhesive
– Wire Nut (for series wiring only)
FIGURE: 1
Positive Busbar
*Included in some Kits
Negative Busbar
Roof Mounting
Roof Hole
Holes (x6)
Knockout
Side
Knockout
Input Connectors
(541) 728-0924

Advertisement

loading

Summary of Contents for Zamp Solar CAP1001

  • Page 1 2 PORT ATP ROOF CAP MOUNTING QUICK START GUIDE TOOLS NEEDED CONTENTS – Drill A. 2 Port ATP Roof Cap (CAP1001) – 1” hole saw B. ATP Receptacle Boot – #2 Phillips Head Screwdriver C. VHB Tape – Step drill bit D.