Installation Instructions; Lifting And Carrying - Vulcan-Hart 3 Series Owner's/Operator's Manual

Burnout furnaces
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS:

UNPACKING:
Save the carton and other packing material for future
use in transporting the furnace.
Shipping damage should be reported to the carrier as soon as detected.

LIFTING AND CARRYING:

DO NOT LIFT FURNACE BY THE TOP MUFFLE ASSEMBLY!
INSTALLATION:
25 mm (1") OD by 25 mm (1")
long

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3-1303-5503-550a3-550pd3-17503-1750a

Table of Contents