SAFETY: OSHA AND CALIFORNIA PROPOSITION 65: MUFFLE DUST EXPOSURE “This product contains substance(s) known to the State of California to cause cancer.” SYMBOL TABLE...
Page 4
FEATURES: 3-SERIES APPLICATIONS: - WAX BURNOUT - CERAMIC FIRING - MATERIAL ASHING - GLASS SEAL FIRING - MATERIAL HEAT TREATING - MATERIAL OXIDIZING...
INSTALLATION INSTRUCTIONS: UNPACKING: Save the carton and other packing material for future use in transporting the furnace. Shipping damage should be reported to the carrier as soon as detected. LIFTING AND CARRYING: DO NOT LIFT FURNACE BY THE TOP MUFFLE ASSEMBLY! INSTALLATION: 25 mm (1”) OD by 25 mm (1”) long...
CONTROL PANEL DESCRIPTION: °C / °F LCD Display Rate ESC (Escape) START STOP Air Control DELAY START Program Parameter Hold Temperature Digit Keys (available on air LEDs exchange models CHANGE only) PROGRAMS ENTER...
Page 11
DELAY SET-UP AND RUNNING A DELAY START PROGRAM PROCEDURE: EXAMPLE 1: EXAMPLE 2: Press “1” then “ENTER” Press “2” then “ENTER” Press “DELAY”- enter time “10:00”-Press “ENTER” Press “DELAY”- enter time “1500”-Press “ENTER” Press “DELAY”-Press “0”-Press “ENTER” Press “DELAY”-Press “1”-Press “ENTER” Press “DELAY”-Press “1600”-Press “ENTER”...
Page 12
DELAY SET-UP AND RUNNING A DELAY START PROGRAM PROCEDURE (CONTD): EXAMPLE 3: NOTE: THINGS TO REMEMBER Day 0 Day 1 Press “3” then “ENTER” End Time approximate Press “DELAY”- enter time “2200”-Press “ENTER” Press “DELAY”-Press “3”-Press “ENTER” Press “DELAY”-Press “0730”-Press “ENTER” Press “DELAY”-Press “START”...
Need help?
Do you have a question about the 3 Series and is the answer not in the manual?
Questions and answers