Summary of Contents for Hyper Tough HT19-401-003-21
Page 1
HT19-401-003-21 Electric Blower ASSEMBLY ASSEMBLY ASSEMBLY 1. ASSEMBLING THE BLOWER TUBE 2. ASSEMBLING THE BLOWER 3. ATTACHING THE EXTENSION CORD Slide the lower blower tube to upper blower tube. Press the tube release button, so that you can slide blower tube to the motor housing.
Page 2
HT19-401-003-21 Electric Blower OPERATION OPERATION OPERATION 4. STARTING & STOPPING 5. USING THE BLOWER 6. ADJUSTING THE BLOWING SPEED WITH 2-SPEED Starting USER TIPS SWITCH Move the On/Off switch to the “I” or “II” On position. - Adjusting the Blowing Speed (I or II) according to the Stopping desired working condition.
Need help?
Do you have a question about the HT19-401-003-21 and is the answer not in the manual?
Questions and answers