Before Use; Installation - Prem-I-Air EH1419 Instructions Manual

Mobile industrial spot cooler
Table of Contents

Advertisement

These instructions should be read carefully and left with the
user of the product for future reference.
Inspect the product including its cable and plug for any signs
of damage. If the product is damaged, DO NOT use it, and
contact your supplier immediately. The appliance contains a
refrigerant gas, so must be kept upright at all times. After
unpacking wait 3 hours for the refrigerant gas to stabilise

before use.

IMPORTANT
Installer and Users please note:
BEFORE USE

INSTALLATION

Attach the two handles to the rear
panel of the appliance. Remove the
four screws from the top left and right
sides of the rear panel.
Use the screws to fix the handles to
the rear panel.
The handles allow the appliance to
be moved more easily, and prevent it
from being damaged.
Attach the flexible tubes to the
apertures on the front panel of the
appliance, using the M5 countersunk
screws provided.
The EH1419 will operate with the
greatest efficiency if it is situated
outside the area to be cooled, and
the cold air ducted in using the two
flexible tubes.
Page 2

Advertisement

Table of Contents
loading

Table of Contents