American Standard STUDIO 2946.BW Installation Instructions Manual page 5

Shower & bath walls

Advertisement

5
Continued:
D) • Locate and drill a clearance hole in the center of the top nailing flange and centered on each stud (see arrows as shown).
• Also drill clearance holes in the front nailing flange on each side panel at approx. 12" intervals, centered on the flange
(see arrows as shown).
• Install galvanized screws through each hole and into the studs, securing the wall panel.
6
Install temporary braces to hold the center of the back and side panels tight
to the studs for approximately 24 hours while adhesive sets. Add cushioning
between panels and braces to prevent scratching the panels.
Drill clearance
holes for screws
5
7
When installing greenboard, position
drywall screws above the top nailing
flange. If you choose to screw
through the nailing flange, you MUST
drill clearance holes in the flange to
avoid cracking/damaging the flange.
7 5 5 14 0 - 10 0