IEC Modular Hi-Rise Replacement Series Installation, Operation & Maintenance Manual

IEC Modular Hi-Rise Replacement Series Installation, Operation & Maintenance Manual

Advertisement

Quick Links

Modular Hi-Rise Replacement Series – MIY
INSTALLATION, OPERATION, & MAINTENANCE MANUAL
ReStora
mini
mod
Build Your Reputation on Ours

Advertisement

Table of Contents
loading

Summary of Contents for IEC Modular Hi-Rise Replacement Series

  • Page 1 Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL ReStora ™ mini Build Your Reputation on Ours...
  • Page 2: Warnings And Cautions

    Compliance with all codes is the of each product may be changed without notice and may not be responsibility of the installing contractor. as described herein. Please contact IEC for information regarding The manufacturer assumes no responsibility current design and product specifications. Statements and other...
  • Page 3: Table Of Contents

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL Table of Contents Warnings and Cautions Water Treatment Water System Balancing SECTION ONE — Receipt, Unpacking, & Controls Operation Inspection Receipt SECTION FIVE — Routine Maintenance Unpacking and Inspection...
  • Page 4: Section One - Receipt, Unpacking, & Inspection

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION ONE — Receipt, Unpacking, & Inspection Receipt Always protect adjacent flammable material when International Environmental Corporation fan coil units welding or soldering. Use a suitable heat- shield represent a prudent investment offering trouble-free material to contain sparks or drops of solder.
  • Page 5: Handling

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION ONE — Receipt, Unpacking, & Inspection, Cont’d. At the time of receipt, the equipment type and dust, or any other debris from being deposited anywhere arrangement should be verified against the order in the unit, including but not limited to motor, blower documents.
  • Page 6: Potential Unit Configurations

    CABINET CS = Cold Water Supply Front Supply NOTES: 1. Risers pictued are shown for reference purposes only and adhere to the IEC 90° 90° standard convention. MRY/MIY equipment is designed to use existing risers, so risers are typically not Supply sold with these models.
  • Page 7: Special Arrangment Options

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION ONE — Receipt, Unpacking, & Inspection, Cont’d. Special Arrangement Options Single-side Supply Single-side and Top Supply Supply Supply Supply 90° 90° 90° 90° Supply Supply Supply 90° 90°...
  • Page 8 Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION ONE — Receipt, Unpacking, & Inspection, Cont’d. Special Arrangement Options Double-side Supply 90° 90° 90° 90° 90° 90° Double-side and Top Supply 90° 90° Supply 90° 90° Supply Supply 90°...
  • Page 9 Any special suply/return arrangement may affect sound and performance. Risers pictured are shown for reference purposes only and adhere to the IEC standard convention. MRY/MIY equipment is designed to use existing risers, so risers are typically not sold with these models.
  • Page 10: Section Two - Product Line Specific Demolition & Installation

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION TWO — Product Line Specific Demolition & Installation ReStora ™ 6. Cut copper supply and return pipes with rotary mini hand tool, leaving the ball valves and 1-2 inches Demolition, Step-by-Step Guide of copper tubing to connect to new coil.
  • Page 11: Installation

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION TWO — Product Line Specific Demolition & Installation, Cont’d. 14. Demolition complete. 7. Thoroughly check the old unit chassis and drywall cuts for any irregularities or protrusions NOTE:...
  • Page 12 Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION TWO — Product Line Specific Demolition & Installation, Cont’d. NOTE: Depending on valve geometry, such Figure 3. Acoustical RA block-off Panel valves may be installed after the new chassis itself has been slid into position, and prior to attachment of the perforated, riser insulation block-off.
  • Page 13 Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION TWO — Product Line Specific Demolition & Installation, Cont’d. Figure 4. Top Opening Figure 6. Top Supply Grille Transition Panel 25. Attach the louvered, return-air deco panel to the new chassis, using both of the 5/16”...
  • Page 14: Riser To Unit Installation

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION TWO — Product Line Specific Demolition & Installation, Cont’d. Riser to Unit Installation Figure 9. Ball Figure 7. Riser Connection Valve Wrench Unit insulation Outer Cabinet Riser Stubout...
  • Page 15: Section Three - Finishing Installation

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION THREE — Finishing Installation that may damage internal components or wiring. maintain air pressure in the riser. Pressure testing The mounting technique is a matter of choice; risers with water should be done with the unit...
  • Page 16: Exposed Unit Touch-Up And Repainting

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION FOUR — Start-Up was selected during order entry. By default, the unit is finish, while latex will not adhere as well and will give a designed to allow for electrical supply wiring to be pulled dull, softer finish.
  • Page 17: Cooling/Heating System

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION FOUR — Start-Up, Cont’d. Cooling/Heating System After proper system operation is established, the actual unit air delivery and the actual fan motor amperage draw Prior to the water system start-up and balancing, the...
  • Page 18: Motor Control Voltage - 3-Speed Relay Board - Factory Settings

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION FOUR — Start-Up, Cont’d. Motor Control Voltage – 3-Speed Relay Board – Factory Settings Pot Board Settings – VDC # of CFM Values @ 0” ESP Unit Values @ 0” ESP...
  • Page 19: Motor Control Voltage - Proportional/Analog Thermostat Settings

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION FOUR — Start-Up, Cont’d. Motor Control Voltage – Proportional/Analog Thermostat Settings Proportional/Analog T’stat Tested CFM values at 0” ESP Unit Model Total # of Coil Unit Voltage Fan Speed Limits (VDC)
  • Page 20: Water Treatment

    Controls Operation IEC water coil tubes and headers are constructed of Before proper control operation can be verified, all other copper. Multiple brass alloys may be present in the valve systems must be operating properly.
  • Page 21: Section Five - Routine Maintenance

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION FIVE — Routine Maintenance SECTION V – Routine Maintenance Should the assembly require more extensive service, it is designed to slide-out of the unit and be removed from the...
  • Page 22: Electric Resistance Heater Assembly

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION FIVE — Routine Maintenance, Cont’d. Electric Resistance Heater Assembly Figure 15. Control Box Door Electric resistance heaters typically do not require periodic maintenance when unit air filters are changed properly.
  • Page 23: Filters, Throwaway (Including Merv)

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION FIVE — Routine Maintenance, Cont’d. Filters, Throwaway (including MERV) Drain The throwaway filter should be replaced on a regular The drain should be checked before initial start-up and at basis.
  • Page 24: Replacement Parts

    Please refer to the Factory website for a general Service- Parts Manual. Unit-specific parts can be identified by your local IEC sales representative by using the “Replacement Parts” QR code label on the unit with a smartphone app, or by directly contacting the factory (405-605-5000).
  • Page 25: Section Six - Checklists

    Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL SECTION SIX — Checklists Receiving and Inspection Unit Start-Up Unit received undamaged General visual unit and system inspection   Unit received complete as ordered Check for proper fan rotation ...
  • Page 26: Terms And Conditions

    15. Payment terms are net thirty (30) days from date of shipment on approved credit. One and one (1) All complete fan coil units built or sold by IEC for twelve (12) months from date of unit start half percent (1 1/2%) per month (18% annual rate) may be charged on past due accounts or the up or eighteen (18) months from date of shipment (from factory), whichever comes first.
  • Page 27 Modular Hi-Rise Replacement Series – MIY INSTALLATION, OPERATION, & MAINTENANCE MANUAL This page intentionally left blank.
  • Page 28 INSTALLATION, OPERATION, & MAINTENANCE MANUAL Contact your local IEC Sales Representative for further details and pricing applicable to this product. Visit our website (iec-okc.com) to find your local IEC Sales Rep. 5000 W. I-40 Service Rd. IEC Part Number: I100-90023660 Oklahoma City, OK 73128 P: 405.605.5000...

This manual is also suitable for:

MinirestoramodMiy

Table of Contents