TOWER PREPARATION

Using single 6.5m length of tube (not supplied) (Appendix A)
· Drill tube as shown on drawing in Appendix A.
· Insert 1 M8 x 65 bolt through the 8.5 hole at the lower guying position, fit and tighten an M8 lock
nut, orientate the nut and bolt so that the flats face the ends of the tube.
· Slide one of the guy plates over the top of the tube with the angled corners pointing down, until it
stops against the M8 nut and bolt.
· Repeat the procedure for the upper guying point.
Using sectioned tower kit CA-12/08 (Appendix B)
See Appendix B for correct orientation of the tube sections.
· Insert M8 x 65 bolts through the 8.5 holes in the top and middle sections of tube, orientate the
nut and bolt so that the flats face the ends of the tube.
· Slide guy plates over the top of the top and middle sections of tube with the angled corners
pointing down, until they stop against the M8 nuts & bolts.
· Join the 3 sections of tube using the joiners provided.