Summary of Contents for Thermo King Heat King 450 Series
Page 1
Installation Manual Heat King 450 Series HK450, HK450 HO and HK450 MAX Diesel Heating Units Revision A T T K K 5 5 6 6 1 1 1 1 8 8 - - 6 6 - - I I M M - - E E N N...
Page 2
All service requirements, major and minor, should be handled by a Thermo King dealer for four very important reasons: • They are equipped with the factory recommended tools to perform all service functions.
Table of Contents S S a a f f e e t t y y P P r r e e c c a a u u t t i i o o n n s s ................................4 4 Danger, Warning, Caution and Notice .
Safety Precautions Danger, Warning, Caution and Notice Thermo King recommends that all service be performed by a Thermo King dealer and to be aware of several general safety practices. Safety advisories appear throughout this manual as required. Your personal safety and the proper installation of this unit depend upon the strict observance of these precautions.
S S a a f f e e t t y y P P r r e e c c a a u u t t i i o o n n s s Battery Installation and Cable Routing W W A A R R N N I I N N G G H H a a z z a a r r d d o o f f E E x x p p l l o o s s i i o o n n ! ! A A n n i i m m p p r r o o p p e e r r l l y y i i n n s s t t a a l l l l e e d d b b a a t t t t e e r r y y c c o o u u l l d d r r e e s s u u l l t t i i n n a a f f i i r r e e , , e e x x p p l l o o s s i i o o n n , , o o r r i i n n j j u u r r y y .
. . A A n n i i m m p p r r o o p p e e r r l l y y i i n n s s t t a a l l l l e e d d f f u u e e l l t t a a n n k k c c o o u u l l d d l l e e a a d d t t o o s s e e r r i i o o u u s s i i n n j j u u r r y y o o r r d d e e a a t t h h . . Unit Weight UNIT WEIGHT* HK450 MAX Heat King 450 series unit with EON battery HK450/HK450 HO installed. 220 kg (484 lbs.) 231 kg (510 lbs) *Does not include the weight of the fuel, the fuel tank and brackets.
I I m m p p o o r r t t a a n n t t I I n n s s t t a a l l l l a a t t i i o o n n R R e e q q u u i i r r e e m m e e n n t t s s Front Wall Dimensions and Swing Radius Figure 1.
I I m m p p o o r r t t a a n n t t I I n n s s t t a a l l l l a a t t i i o o n n R R e e q q u u i i r r e e m m e e n n t t s s Mounting Bolt Specifications N N O O T T I I C C E E E E q q u u i i p p m m e e n n t t D D a a m m a a g g e e ! !
Page 9
I I m m p p o o r r t t a a n n t t I I n n s s t t a a l l l l a a t t i i o o n n R R e e q q u u i i r r e e m m e e n n t t s s Figure 2.
Component Dimensions Unit Dimensions Figure 3. HK Unit Dimensions Shown 1117.60 mm (44.00 in. 86.61 mm (3.41 in.) 87.88 mm (3.46 in.) 833.12 m (32.8 in.) 920.75 m (36.25 in. AAA670-1 TK 56118-6-IM-EN...
95 amp/hr. N N o o t t e e : : See following table for Thermo King approved batteries. Refer to Service Bulletin T&T 446 for more information regarding Battery Selection and Maintenance.
C C o o m m p p o o n n e e n n t t D D i i m m e e n n s s i i o o n n s s Battery Dimensions Figure 5.
Page 14
Required Tools 1. Safety Glasses 2. Drill 3. Drill Bits 4. Tape Measure 5. Mechanics Tools 6. Lifting Device 7. Two Forged Eyebolts (1/2–13 UNC) 8. Work Platform (Recommended) 9. Torque Wrench N N o o t t e e : : Equipment such as torque wrenches should be in good working condition and routinely calibrated to assure accurate readings.
Page 15
Installation Kit Components HARDWARE KIT FUEL LINE KIT FUEL PUMP KIT Clamps 1/4” OD x 40 ft. Fuel Hose Fuel Pump Band wraps 3/8” OD x 40 ft. Fuel Hose 3/8 Hose Fiting 1/4–20 SS Screw 1/4” Eyelet Fitting Fuel Pump Bracket 1/4–20 SS Nut 3/8”...
Page 16
Attach lifting device to eyebolts and slightly raise unit and remove hardware holding unit to crate. N N o o t t e e : : For Zero–Cube installations, refer to Zero-Cube installation instructions (TK 56142) available at Thermo King iService or Thermoking.com.
Installing Remote HMI Surface Mount Installation N N o o t t e e : : The installation views shown are for reference only. The actual locations chosen for installing the remote HMI may vary per your specific application and should not interfere with the operation of the trailer or container. 1.
I I n n s s t t a a l l l l i i n n g g R R e e m m o o t t e e H H M M I I Flush Mount Installation N N o o t t e e : : NOTE: Installer to provide a recessed pocket in the trailer wall to accommodate the remote HMI.
Remove plastic cap from the fuel vent and point the outlet towards the rear of the trailer. I I m m p p o o r r t t a a n n t t : : The factory installed fuel tank air vent must be in place and functional for the Thermo King unit’s fuel system to operate correctly and for the fuel tank to remain in compliance with Federal Motor Carrier Safety Administration specifications (title 49, paragraph 393.67).
Page 21
I I n n s s t t a a l l l l i i n n g g F F u u e e l l S S y y s s t t e e m m Figure 9.
Remove plastic cap from the fuel vent and point the outlet towards the rear of the trailer. I I m m p p o o r r t t a a n n t t : : The factory installed fuel tank air vent must be in place and functional for the Thermo King unit’s fuel system to operate correctly and for the fuel tank to remain in compliance with Federal Motor Carrier Safety Administration specifications (title 49, paragraph 393.67).
Page 23
I I n n s s t t a a l l l l i i n n g g F F u u e e l l S S y y s s t t e e m m Figure 10.
Page 24
Installing Battery W W A A R R N N I I N N G G P P e e r r s s o o n n a a l l P P r r o o t t e e c c t t i i v v e e E E q q u u i i p p m m e e n n t t ( ( P P P P E E ) ) R R e e q q u u i i r r e e d d ! ! A A b b a a t t t t e e r r y y c c a a n n b b e e d d a a n n g g e e r r o o u u s s .
Service Test Procedure Engine Break-in Test The following procedure is used to run the unit for 10 hours to break-in the diesel engine. 1. Ensure software revision is E E B B 0 0 4 4 or higher. 2. Open PC Monitor - In the menu on the left is a page called “Service Test” - this page is new, the only test is the break-in Test.
Page 27
System Check List All unit mounting hardware torqued to specifications. Battery secured correctly and all connections clean and tight. No air gaps between unit and trailer wall. Remote HMI mounted securely. Drain hose properly routed and secured. Run Pre-Trip Inspection (refer to Operator’s Manual). Fuel tank properly installed.
Page 28
1938. For more information, visit www.thermoking.com or www.tranetechnologies.com. Thermo King has a policy of continuous product and product data improvements and reserves the right to change design and specifications without notice. We are committed to using environmentally conscious print practices.