Installation; Preparation Of Connections; Connection Position Chart - BATO RENO1500 Installation Manual

Table of Contents

Advertisement

Available languages

Available languages

Installation

Preparation of Connections

Due to technical advance positioning
of relevant connections on the bathtub
may be optimized. Literature dimen-
sions are for reference only. Instal-
lation dimensions should be taken
directly from the tub.
The following positioning of the water and
electricity supply is suggested for standard
operation of the bathtub.

Connection Position Chart

Preparation

Advertisement

Table of Contents
loading

Related Products for BATO RENO1500

Table of Contents