Important User Information; Installation Checklist - Crest Audio Console Junior Operator's Manual

Series ultrasonic washer
Table of Contents

Advertisement

IMPORTANT USER INFORMATION

IMPORTANT: A listing of the Safety Precautions to be observed when operating or servicing this e
Ultrasonic Cleaning System can be found in S
you have become familiar with this information.
2.1 Installation
REMEMBER – POSSIBLE
TIME DELAY: Insufficient
clearance space will make
repairs more difficult and
time-consuming. Refer to the
equipment drawing for
minimum clearance for
service/maintenance access
requirements.
CAUTION – POSSIBLE
EQUIPMENT DAMAGE:
Failure to remove shipping
bracket and hardware from lid
counterweights will result in
lid and/or unit cabinet
damage.
Crest Healthcare Console Junior R:1
Important User Information
After installing cleaning system according to the previously supplied
Checklist
Equipment Utility Requirements and Specifications and Equipment
Drawings, complete the following checklist to ensure complete and
correct installation.
Shutoff valves (not provided by Crest), for maintenance purposes
and capable of being locked in OFF position only. Install water
lines and in compliance with local occupational health and safety
regulations, as well as electric and plumbing codes.
Disconnect switches (not provided by Crest), for maintenance
purposes and capable of being locked in OFF position only,
install electrical supply lines near unit and in compliance with local
occupational health and safety regulations, as well as electric and
plumbing codes. Disconnect switches must bear the identification
of the equipment to which they are connected.
NOTE:If unit is installed next to other equipment, shutoff
valves and disconnect switches should be located so that
service can be shut off to one piece of equipment at a time.
Cleaning system is positioned on a hard, level surface as shown on
equipment drawing, with required clearance space and in relation
to building supply lines.
Cleaning system is level. Use levelling legs if necessary.
For cleaning system, verify lid counterweights shipping
bracket and hardware are removed from rear of cabinet (see
Figure 2-1).
Building cold water line supplies water to unit as specified on
equipment drawing.
Building hot water line supplies water to unit as specified
on equipment drawing.
Building waste line is provided to unit as specified on
equipment drawing.
Verify all quick disconnect clamps are tightened. Tighten if
necessary.
Ensure all switches are properly installed, adjusted
and connected.
Ensure facility power meets requirements listed on
nameplate located on front of unit (see S
E
LECTRICAL
Operator Manual
1. Do not operate or service equipment until
ECTION
).
2
2.3.2,
ECTION
2-1

Advertisement

Table of Contents
loading

Table of Contents