Syhnc100-Sek - Bosch Rexroth SYHNC100-SEK 3 Series Operating Instructions Manual

Digital controller assembly for the secondary control of axial piston units
Table of Contents

Advertisement

RE 30162-B/04.11 | SYHNC100-SEK...X
6.4
SYHNC100-SEK...3X mechanical assembly
Assemble the SYHNC100-SEK...3X on a top hat rail as follows:
Carefully engage the rear wall of the SYHNC100-SEK...3X housing on a top
hat rail and check for safe seat. The mechanical contact points on the elastic
rear wall of the SYHNC100-SEK...3X allow for a safe seat on the top hat rail
and the connection of the housing with the control cabinet's earthing system.
Connect
Press down
Fig. 2:
SYHNC100-SEK...3X assembly on the top hat rail
Contact points
Fig. 3:
Contact points of the SYHNC100-SEK...3X for assembly on top hat rail
By snapping the housing of the SYHNC100-SEK...3X on a conductive assembly
rail, the earth connection to the control cabinet rear wall is established. This
constitutes the HF earthing of the SYHNC100-SEK...3X.
Bosch Rexroth AG
Assembly
Engage
Top hat rail 35 mm
TH 35-7.5 or TH 35-15
according to EN 60715
25/44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents