Up-Eco Power Unit Installation For Cb-E Control - Sabiana Carisma Whisper CFF Instructions For Installation, Use And Maintenance Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 23
EN
UP-ECO power unit installation for CB-E
control
Instructions for installing the power unit when not
factory installed.
The basic units, supplied without controls, are
equipped with an electrical terminal board prepared
for connection to external controllers.
To install the power unit proceed as follows:
2.13
1
1. It is necessary to remove the cable fastener (1)
and the terminal board group with the related
motor cables (2) from the right side of the fan
coil unit.
2. Remove the terminal board applied on the
shoulder by unscrewing the two self-tapping
screws. The two holes shown in the figure are
those that will then be used to fix the power
board.
34
2
2.14
3. Remove the power board cover. The electronic
board is supplied with the cables connected.
2.15
4. Fix the power board using the 2 self-tapping
screws supplied.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Carisma whisper ecm

Table of Contents