1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
Upright profile cover cap
2
13
Fixed panel Top and bottom seal
Wall profile
Top and bottom profile
2
2
14
3
ST4X30 screw
6
15
Bottom roller
Uprightprofile
4
2
16
ST4X25 screw
5
Fixed panel upright seal
2
17
Top roller
6
Moving panel upright seal
2
18
Squeeze gasket tool
Moving panel
7
2
Magnetic seals
8
2
Wall plug
9
6
10
Handle
2
11
Screw cap
12
12
ST4X10 screw
6
D06958
D06959
D06960
D06961
D06962
Nabis 6mm Quadrant
Nabis 6mm Offset Quad
16
17
18
4
2
4
2
4
1
1
1
INSTALLATIONGUIDE
2 Door Quadrant
IMPORTANT
Please familiarise yourself with the fitting instructions before
commencing fitting.
1 Check that you have the tools required
2 Check that the installation site is compatible
with size of door supplied
3 Check all the enclosure components
4 Check that the installation kit is complete
DO NOT attempt to install the product unless you can tick ALL 4 boxes
as satisfactory.
The wall plugs supplied with the installation kit are for use in solid walls.
Hollow or 'stud-partition' walls will require alternative fixings.
Please consult a hardware supplier for the correct type.
It may also be necessary to consult your tiling supplier about the correct
method for drilling your tiles.
Any missing or damaged parts must be reported immediately.
Inspect shower enclosure before fitting. No claims will be accepted after product has been installed
For safety, it is recommend that 2 people should install the product
Use appropriate Personal Protective Equipment at all times when installing the product.
Top roller
x4
ST4X30
ST4X25
ST4X10
x6
x2
x6
Profile cover cap L
Profile cover cap R
x1
x1
Tools required (not supplied in hardware kit)
- 6mm masonry drill bit
- 3mm HSS metal drill bit
- Power drill
- Quality silicone
- Pencil
- Tape measure
- Philips head screw driver
- Spirit level with horizontal and vertical level indicators
- Water spray
IMPORTANT - Installation Site
1.Ensure the top surface of the shower tray on which the enclosure will be installed is level
in every direction.
2.The tiling or other wall finishing should be effectively sealed at the tray edges.
3.Tiles should extend at least to the corners of the tray and a minimum of 2 metres from the
top of the tray.
Drilling / Fixing
1.The supplied fixings/wall plugs are only for mounting directly on solid walls.
2.It is essential that the solid, masonry/walls be inspected for adequate load-bearing capacity
prior to every installation.
3.The supplied fixings/wall plugs are not for use with stud walls such as plaster board, wood,
metal or fiber board.
4.Always seek professional advice to confirm wall type and appropriate type of fixing to be
used for installation.
5.Always check walls for concealed utility lines (power, gas, and water) prior to drilling the
fixing holes.
Bottom roller
x4
WALL PLUG
SCREW CUP
INSTALLATION TOOL
Ø6
x12
x1
x6
Handle
x2
2
2
Need help?
Do you have a question about the nabis D06958 and is the answer not in the manual?
Questions and answers