5.4

Drying

1) Wipe the equipment with a single-use, fluff-free wipe or towel
to remove moisture from the surface of the equipment.
2) Dry the probe naturally in an ambient temperature between
15-30°C for a minimum of 4 hours. Alternatively the probe can
be dried using a drying heater at a temperature of less than
60°C.
5.5

Inspection

Inspect the equipment for any damage such as crack, scratch or
deformation. Do not use it if any damage is found.
5.6

Packaging

Pack
the
probe
Polypropylene
Polyethylene film and Tyvek®, and then place it into a tray. The
tray should be also covered with a sterile barrier.
Additionally the probe can be placed on plastic mesh wires supplied
for plasma sterilization and then packed as mentioned above.
The probe can be packed in a simple or double packing.
Please note that the size of a sterile barrier should be large
enough to be able to pack the equipment leaving sufficient space
to seal it completely.
A sterile barrier should be sealed by an appropriate sealing
machine and it is important to confirm that the package is sealed
completely. If the sealing is not complete, pack and reseal again.
5.7

Sterilization

The probe and accessory can be sterilized using either ethylen
oxide gas (EtO) sterilization or plasma sterilization (see table
in the next page).
Follow
the
manufacturer's
regarding usage, temperature and sterilization-time.
in
a
sterile
fleece
or
transparent
instructions
- 21 -
barrier
such
package
of
the
Drying
Packaging
as
made
from
Sterilization
sterilizer
Q1E-EP1019

Advertisement

Table of Contents
loading

Table of Contents