XPower XD-85LH Owner's Manual page 11

Hide thumbs Also See for XD-85LH:
Table of Contents

Advertisement

Available languages

Available languages

Installation and Operation Guide
Start Your Job (Continued)
Secondary Intake (Opened)
Secondary Intake (Closed)
!
Important: Close the secondary intake when environment temperature falls
under 68 °F (20 °C) or in contaminated environment for better efficiency.
To close the secondary intake, remover the filter case, rotate and re-install.
Drainage (Important)
• Press the Manual Drainage button to process drainage manually. It will last for 45
seconds and won't stop dehumidification or defrosting process.
• If the water tank is full or not positioned horizontally, the water tank full indicator light
will go on. Any dehumidification or defrosting process will pause and the machine will
automatically process drainage for 45 seconds. Afterwards, if the water tank is still
detected full, an error code will be displayed
Troubleshooting
• When turned off, the machine will automatically process drainage for 60 seconds.
Please wait until this process completes.
• Please do not lift the drainage hose higher than 16 feet (5 m) above the machine.
Calculate the usage time
• Please remember to write down the ending time
shuts down.
• Compare the starting time and the ending time to calculate the usage time.
Guide).
CT
F/C
Secondary Filter Case
(See Page 9: Error Codes or Page 14:
°C
TOTAL TIME
%
RH
(Continued)
right before the machine
English - 11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xd-85l2

Table of Contents