Article pass / Guarantee certificate Scope of delivery • Ground work • Assembly • Maintenance 5 59 147 5 Exercising active boat Attention: Guarantee Keep these documents in a safe place. Please indicate the workshop order number (RM-Nummer) in all inquiries and complaints. RM-Nummer: No: UK-1411-V-10...
µ grants the following warranty periods: The present information reflects the status as valid at the time this document was issued. For updated information, please see our website www.eibe.de • 10 years on all pressure-impregnated timber for all cases of decay and fungo attacks •...
Page 3
Congratulations on your choice! All µ every year. items are produced of select materials and eibe resistant playground timber (rpt) is subjected to severe quality checks. <P> treated with a protective oil based surface All µ items are fabricated in such a way as finish.
Page 4
In the on swings, bridge supports, cableway struts) make sure they are not worn through) operative inspection, eibe specifies how often of the playground equipment. which areas must be inspected on this piece of The wall thickness/corrosion on the inside of...
Page 5
5 59 147 5 Bei Bedarf verwenden If required use it Indien nodig Su richiesta En cas de besoins Szükség esetén Según necesidad 0,00 m 0,50 m 1,00 m 1,50 m 2,00 m 2,50 m 3,00 m 3,50 m 4,00 m 4,50 m 5,00 m 5,50 m...
5 59 147 5 Equipment data: Surfacing inside the impact area: sand, gravel, bark mulch, wood chips, impact-attenuating tiles Filling height for bulk material such as sand, gravel, wood chips and similar: 40 cm Maximum free fall height: 2,11 m Minimum equipment space: 13,05 x 7,71 x 4,02 m Required mounting space:...
Page 8
5 59 147 5 Foundation plan showing µ prefabricated foundations Impact-attenuating surface according to EN 1176: for outdoor playground equipment only! Please allow for a distance to other objects of at least 1.5 m all around the equipment (EN 1176). This area must be absolutely free of hard or sharp-edged or protruding parts a child could fall onto.
Page 9
5 59 147 5 Foundation plan showing in-situ concrete footings made from C20/25 concrete. (Leave foundations to harden for at least 14 days before mounting the equipment.) Impact-attenuating surface according to EN 1176: for outdoor playground equipment only! Please allow for a distance to other objects of at least 1.5 m all around the equipment (EN 1176).
Page 10
5 59 147 5 Scope of delivery 1x G 58 108 0 1x G 58 111 0 11 5586510 = GFK 5586540 = GFK + VA 5586570 = VA 10x G 58 176 0 38x G 51 372 0 5586710 = GFK 5586730 = GFK + VA 1x 5 58 651 0 <X>...
Page 12
5 59 147 5 Scope of delivery 2x G 51 561 0 1x G 51 574 0 1x G 51 311 5 1x G 51 573 0 1x G 51 312 5 2x G 54 317 5 1 x G 51 398 0 1x G 51 339 5 2x G 51 340 5 1x G 51 341 0...
Page 13
5 59 147 5 Scope of delivery 1 x G 51 399 0 1x G 51 383 0 1x G 51 382 0 1x G 51 381 5 2x G 51 380 5 1x G 51 379 0 1x G 51 384 7 1x G 51 385 0 1x G 51 386 0 1 x G 51 395 5...
Page 14
5 59 147 5 package circular 1x K 55 556 0 1x G 51 371 0 1x K 55 385 0 1x B 20 235 0 <X> 2x K 50 340 0 2x B 20 251 0 <X> 1x K 55 552 0 <X>...
Page 15
5 59 147 5 package circular 2x S 01 183 0 10x220 1x M 54 022 0 1x M 54 023 0 57x S 08 056 0 21x S 08 055 0 M12x60 M10x60 20x S 01 174 0 76x S 01 179 0 63x S 01 155 6 10x S 01 152 0 5x S 01 148 0...
Page 17
e e comporta l'obbligo di indennizzo. Dit document is wederrechtelijk besch Mounting example Blow out hole draw ø = 14 mm ø = 14 mm t = 110 mm t = 110 mm B 20 005 0 B 20 005 0 Twist in reaction Check mortar cartridge 37°C...
Page 18
5 59 147 5 1x G 51 304 3 -SF 1x G 51 305 3 -SF 1x G 51 339 5 1x G 51 342 5 1x G 51 355 5 1x G 51 356 0 1x G 51 358 5 1x G 51 359 0 1x G 51 362 0 G 51 355 5...
Page 19
5 59 147 5 1x G 51 324 3 -SF 1x G 51 325 3 -SF 2x G 51 340 5 1x G 51 357 0 1x G 51 368 0 G 51 324 3 -SF G 51 325 3 -SF G 51 340 5 G 51 368 0 S 01 177 0...
Page 20
5 59 147 5 1x G 51 379 0 2x G 51 380 5 G 51 379 0 G 51 380 5 90° S 01 177 0 10x120 S 01 177 0 10x120 S 01 174 0 10x80 G 51 380 5 20/36...
Page 21
5 59 147 5 1x G 51 307 3 -SF 1x G 51 322 3 -SF 1x G 51 360 0 1x G 51 361 0 1x G 58 108 0 G 51 307 3 -SF G 51 361 0 S 01 177 0 10x120 G 51 360 0...
Page 22
5 59 147 5 1x G 51 381 5 1x G 51 384 7 S 01 177 0 10x120 S 01 177 0 10x120 S 01 174 0 10x80 G 51 384 7 G 51 381 5 180° 22/36...
Page 23
e e comporta l'obbligo di indennizzo. Dit document is wederrechtelijk besch Mounting example G 51 343 0 -PB05 S 08 55 0 - M10x60 S 46 004 0 - A 13 K 55 231 0 - A 10,5 10 x 120 S 01 177 0 A 10,5 - DIN 9021 S 45 001 0...
Page 24
5 59 147 5 2x G 51 561 0 -SF 2x G 54 317 5 -SF 1x G 51 388 0 1x G 51 389 0 1x G 51 390 0 1x G 51 391 0 S 01 155 6 5,0x70 1x G 51 392 5 1x G 51 393 5...
Page 25
5 59 147 5 1x G 51 303 3 -SF 1x G 51 569 0 -SF 1x G 51 311 5 1x G 51 312 5 1x G 51 326 3 -SF G 51 312 5 G 51 569 0 -SF 1x G 51 564 0 G 51 326 3 -SF G 51 373 0...
Page 26
5 59 147 5 1x G 51 302 3 -SF 1x G 51 308 3 -SF 1x G 51 329 5 1x G 51 349 0 1x G 51 352 0 G 51 352 0 S 01 177 0 10x120 G 51 329 5 G 51 349 0 90°...
Page 27
5 59 147 5 1x G 51 301 3 -SF 1x G 51 327 5 1x G 51 350 0 1x G 51 353 0 S 30 100 1 - M12x170 - DIN603 S 08 056 0 - M12x60 K 50 161 0 - M12 K 55 233 0 - A12,5 S 01 177 0 10x120...
Page 28
5 59 147 5 10 1 . S 01 183 0 - 10x220 G 51 327 5 G 51 301 3 G 51 327 5 S 01 183 0 - 10x220 G 51 301 3 28/36...
Page 29
5 59 147 5 1x G 51 382 0 1x G 51 383 0 1x G 51 385 0 1x G 51 386 0 S 01 177 0 10x120 S 01 177 0 10x120 G 51 383 0 S 01 174 0 10x80 G 51 382 0 G 51 386 0...
Page 30
5 59 147 5 1 . 2 1x G 51 573 0 -SF 1x G 51 560 0 -SF S 30 102 1 - M12x190 - DIN603 K 50 161 0 - M12 S 08 056 0 - M12x60 K 55 233 0 - A 12,5 S 30 105 1 - M12x220 - DIN603 K 50 161 0 - M12 S 08 056 0 - M12x60...
Page 31
5 59 147 5 1 . 3 S 08 056 0 - M12x60 S 45 002 0 - A 13 S 08 056 0 - M12x60 S 45 002 0 - A 13 K 55 233 0 - A 12,5 S 08 056 0 - M12x60 S 45 002 0 - A13 K 55 552 0...
Page 32
5 59 147 5 K 55 021 0 S 01 155 6 - 5,0 x 70 S 08 054 6 S 48 002 0 - PA6 M8x15 M 54 022 0 S 30 031 1 M8x25 S 38 050 0 M8x30 DIN7991 S 08 054 6...
Page 33
5 59 147 5 Align Tighten all screw connections. Wait 14 days. Tighten all screw connections. 33/36...
Page 34
Mounting example M 10 - DIN 986 S 37 004 0 M 10 - DIN 555 S 34 003 0 A 10,5 - DIN 9021 S 45 001 0 M 10x30 S 22 001 0 90° 5 6 3 0 7 0 10 x 100 - DIN 571 S 27 030 0 A 10,5 - DIN 9021...
Page 35
Mounting example K 55 383 0 S 08 055 0 M10x60 K 55 385 0 B 20 021 0 - SRL35 B 20 030 0 K 55 231 0 S 47 009 0 S 47 003 0 A10,5 - DIN125 S 29 031 1 M10x130 - DIN601 35/36...
Page 36
Proof of maintenance and repair work 5 59 147 5 Person Day of Verification Defects eliminated inspection responsible Defects (name, date, signature) 36/36...
Need help?
Do you have a question about the tema 5 59 147 5 and is the answer not in the manual?
Questions and answers