Technical Data; Installation - Bauer ARC Installation And Maintenance Manual

Swing gates.
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 8
1.

TECHNICAL DATA

Power supply
Absorption
Torque
Opening time
Service class
Min number of
consecutive cycles
Intermittence
Temperature
Degree of protection
Control panel
Applications
m = leaf width
kg = leaf weight
Recommended
dimensions
Limit dimensions
2.
REFERENCE TO ILLUSTRATIONS
The given operating and performance features can only be
guaranteed with the use of DITEC accessories and safety
devices.
2.1 Standard installation references (fig. 1)
[1]
Radio
[2]
Flashing light
[3]
Key selector
[4]
Connect power supply to a type-approved omnipolar
switch with a contact opening gap of no less that 3 mm
(not supplied) protected against accidental and unautho-
rized activation.
Connection to supply mains must be carried out in an
independent raceway separate from control connections
and safety device connections.
[5]
Control panel
[6]
Geared motor
[7]
Photocells
2.2 Geared motor references (fig. 2)
[8]
Gate attachment bracket
[9]
Housing
[10] Attachment plate
[11] Drilling templates for release key
[12] Release shaft
2.3 Accessories
ARCFB
Adjustable stop [*]
ARCPL
Plate for front attachment of geared motor [*]
BOXFC1
Limit switch
[*] Attention: two TCEI M8x130 screws (not supplied) are ne-
cessary in order to use the ARCFB and ARCPL accessories at
the same time.
ARCB
230 V~ / 50 Hz
1,2 A
300 Nm
22 s / 90°
3 - FREQUENT
20
S2 = 15 min
S3 = 25%
-20° C / +55° C
IP54
E2
500 kg
400 kg
300 kg
200 kg
100 kg
1
2
3
3.
Unless otherwise specified, all measurements are expressed
in millimetres (mm).
3.1 Preliminary checks
Check that the structure is sufficiently sturdy and that the hinge
pivots are properly lubricated. Provide an opening and closing
stop.
3.2 Geared motor installation
-
-
-
-
-
-
-
-
-
9
ARC1BH
24 V=
12 A
300 Nm
15÷30 s / 90°
4 - INTENSIVE
>50
S2 = 30 min
S3 = 50%
-20° C / +55° C
IP54
VIVAH
500 kg
400 kg
300 kg
200 kg
100 kg
4
5
m

INSTALLATION

Remove the geared motor from its package.
Attention: cover [9] is not secured.
Disassemble the reduction gear from the fixing plate [10].
Attach plate to gate column according to measurements
specified in fig. 3-4 depending on type of installation.
Assemble the geared motor on the fixing plate following
fig. 5 for the fitting onto the left pier, inside view, and fig.
6 for fitting onto the right pier, inside view.
Release the geared motor (see OPERATING INSTRUC-
TIONS).
Attach articulated arms and gate attachment bracket as
shown in fig. 7-8 and according to measurements speci-
fied in fig. 3-4.
Attention: bring the leaf to the stop line, align the arms by
means of holes [D] as shown in the detail in fig. 7.
The articulations on the arms should be lubricated and
the screws tightened in such a way as not to block arm
movement.
Drill the cover Ø14 near release shaft [12] (there are two
drilling templates [11] inside the cover)
Insert the rubber plug and attach the cover to the geared
motor.
GB
ARCBH
24 V=
3 A
150 Nm
15÷18 s / 90°
4 - INTENSIVE
>50
S2 = 30 min
S3 = 50%
-20° C / +55° C
IP54
E2H
1
2
3
4
5
m
ARC - IP1725

Advertisement

Table of Contents
loading

This manual is also suitable for:

ArcbArc1bhArcbh

Table of Contents