Download Print this page

gAvilar gDC-100 Installation And Operation Manual page 4

Advertisement

Available languages

Available languages

3. Technical data
Article code
DVGW approval
Pressure class
Nominal width
Connection
Service temperature
Service life
Materials
4. Mounting
Before mounting the gDC-100 please
make sure the flow direction of the gas
station and the arrow of the coupling
(see bottom of the coupling) points in
the same direction. The PLEXOR
inspection system will not function
correctly if the gDC-100 is installed
wrongly. The gDC-100 can best be
mounted horizontally in the forward
position, to reduce the
risk of internal and external
contamination. Please make sure that
there is enough space for easy
connection with the PLEXOR
connector.
Note
If the gDC-100 is to be installed in a new
duct, it is recommended, to bend and install
the duct without the gDC-100 first and then
place the gDC-100 as shown in figure above
: 67032
: -
: PN16
: DN10
: G¼
: -20 / 70°C
:
> 10.000x
connecting and
disconnecting
operations
:
AiMgSi1
Stainless steel
POM
NBR Rubber
EPDM
®
*
®
* hose
5. Use
5.1 Connecting the gDC-100 to the
®
PLEXOR
* inspection system:
Unscrew the protective cap from
the gDC-100.
Connect the hose connector to the
test device. For this, refer to the
®
PLEXOR
* test device manual.
Screw the hose connector on the
gDC-100 until it is hand tight. For
this, refer to the PLEXOR
device manual.
®
The PLEXOR
* inspection system is
now safely connected to the gDC-100.
5.2 Disconnecting the gDC-100 from
®
the PLEXOR
* inspection system.
Loosen the hose connector from
the gDC-100.
De-aerate the PLEXOR
device. For this, refer to
®
PLEXOR
* test device's manual.
Completely loosen and remove the
hose connector from the gDC-100.
Screw the gDC-100's protective
cap back on.
6. General maintenance
Maintenance of the gDC-100 is
restricted to replacing the O-rings. The
expected service life of these O-rings
is at least 20 years.
®
* test
®
* test
4

Advertisement

loading