GSI Group 2000 Series Operator's Manual

Top dry heater control unit

Advertisement

Quick Links

Series 2000 Top Dry
Heater Control
Operator's Manual
PNEG-743
Date: 09-27-20
PNEG-743

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 2000 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for GSI Group 2000 Series

  • Page 1 Series 2000 Top Dry Heater Control Operator's Manual PNEG-743 Date: 09-27-20 PNEG-743...
  • Page 3: Table Of Contents

    T T T T T A B L E O F C O N T E N T S A B L E O F C O N T E N T S A B L E O F C O N T E N T S A B L E O F C O N T E N T S A B L E O F C O N T E N T S Series 2000 T...
  • Page 4: Safety

    Avoid any alterations to the equip- ment. Such alterations may produce a very dan- The principal concern of the GSI Group, Inc. ("GSI") is your safety and the safety of others asso- gerous situation, where serious injury or death ciated with grain handling equipment.
  • Page 5: Safety Decals

    Dr op Dr y Heater Control y Heater Control y Heater Control The GSI Group, Inc. recommends contacting your local power company, and having a representative survey your installation so the wiring is compatible with their system, and adequate power is supplied to your unit.
  • Page 6: Fan And Heater Operating Procedure

    O P E R A O P E R A O P E R AT I N G T I N G T I N G T I N G P R O C E D U R E P R O C E D U R E P R O C E D U R E O P E R A O P E R A...
  • Page 7: Programming Top Dry Plenum And Grain Temperatures

    O P E R A O P E R A O P E R AT I N G T I N G T I N G T I N G P R O C E D U R E P R O C E D U R E P R O C E D U R E O P E R A O P E R A...
  • Page 8: Programming Top Dry-Dry And Cool Timers

    O P E R A O P E R AT I N G O P E R A T I N G T I N G T I N G P R O C E D U R E P R O C E D U R E P R O C E D U R E O P E R A O P E R A...
  • Page 9: Setting Gas Pressure

    O P E R A O P E R A O P E R AT I N G T I N G T I N G T I N G P R O C E D U R E P R O C E D U R E P R O C E D U R E O P E R A O P E R A...
  • Page 10: Running The Dryer

    O P E R A O P E R AT I N G O P E R A T I N G T I N G T I N G P R O C E D U R E P R O C E D U R E P R O C E D U R E O P E R A O P E R A...
  • Page 11 Q U I C K S T Q U I C K S T Q U I C K S TA R T P R O C E D U R E A R T P R O C E D U R E A R T P R O C E D U R E A R T P R O C E D U R E Q U I C K S T...
  • Page 12: Top Dry Quick Start Procedure

    D R Y I N G D R Y I N G D R Y I N G R AT E S / S H E L L E D T E S / S H E L L E D T E S / S H E L L E D T E S / S H E L L E D C O R N...
  • Page 13: Drying Rates For Shelled Corn

    D R Y I N G D R Y I N G D R Y I N G R AT E S / S H E L L E D T E S / S H E L L E D T E S / S H E L L E D T E S / S H E L L E D C O R N...
  • Page 14: Factory Configuration

    F F F F F A C T O R Y A C T O R Y A C T O R Y A C T O R Y C O N F I G U R A C O N F I G U R AT I O N C O N F I G U R A T I O N T I O N...
  • Page 15: Error Conditions

    E R R O R E R R O R E R R O R C O N D I T I O N S C O N D I T I O N S C O N D I T I O N S E R R O R E R R O R C O N D I T I O N S...
  • Page 16 Series 2000 T Series 2000 T op Dr op Dr y Heater Control y Heater Control Series 2000 T Series 2000 T Series 2000 Top Dr op Dr op Dr y Heater Control y Heater Control y Heater Control NOTES...
  • Page 17: Warranty

    Limited Warranty — N.A. Grain Products The GSI Group, LLC. (“GSI”) warrants products which it manufactures, to be free of defects in materials and workmanship under normal usage and conditions for a period of 12 months from the date of shipment (or, if shipped by vessel, 14 months from the date of arrival at the port of discharge).
  • Page 18 Authorities having jurisdiction should be consulted before installation occurs. The GSI Group, Inc. 1004 E. Illinois St. Assumption, IL 62510-0020 Phone: 217-226-4421 Fax: 217-226-4420 e-mail: gsisales@grainsystems.com internet: http://www.grainsystems.com Copyright © 2005 by The GSI Group Printed in the USA...

Table of Contents