Alaska Tent & Tarp Prospector & Miner Framed Wall Tent Setup Instructions

Advertisement

Prospector & Miner Framed Wall Tent
1. Make sure you have a clear area to setup your tent.
2. Lay out all of the pieces of the frame and place the angles 3' apart making an outline of the
frame. There should be three rows of angles with four angles (two end angles and two center
angles) in each row.
3. Put together the ridge poles, which are marked in blue. There are three ridge poles – two
eaves and one ridge
a. Attach three pieces together, forming one long pole.
b. Slide two center angles onto each ridge pole. The center angles should cover the
junctions of the pole sections.
c. Attach end angles to either end of the ridgepole.
4. Put together the rafter poles, which are marked in red. There are eight rafter poles – four for
each side of the tent.
a. Attach two pieces together, forming one long pole.
b. Place one end of the rafter pole into the angle on the eave and the other end of the
rafter pole into the angle on the ridge.
5. Place the wall tent on top of the frame.
a. Pull out the wall tent cover and lay it along the side of the frame.
b. Grab the bottom portion of the tent and pull up and over the frame.
c. Position each angle of the tent so it matches the angles of the frame.
d. Flip up the side walls above the eaves of the tent for easy installation of the leg poles.
Setup Instructions
Center Angles
Ridge Junction
End Angles
Eave Junction

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Prospector & Miner Framed Wall Tent and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Alaska Tent & Tarp Prospector & Miner Framed Wall Tent

  • Page 1 Prospector & Miner Framed Wall Tent Setup Instructions 1. Make sure you have a clear area to setup your tent. 2. Lay out all of the pieces of the frame and place the angles 3’ apart making an outline of the frame.
  • Page 2 6. Install the legs on the tent, which are marked in black. There are eight leg poles. a. Layout the leg poles so four are laying on each side of the tent. b. Lift the edge of the tent and frame. Place the leg poles on the eave angles on one side of the tent.

Table of Contents