6.
Environmental checks
• The installation location must be easily accessible
• Prevent access to the installation location by children
• The minimum air volume in the installation location must be
15m³ and equipped with two openings with a diameter of 6cm
for natural air circulation. If the two openings are located in
the same wall they must be made at a minimum distance of 2
metres from each other.
• Installation of the unit in a location exposed to solar rays must
be avoided as it may cause:
- power limitation phenomena in the inverter (with a resulting
decreased energy production by the system)
- premature wear of the electrical/electromechanical com-
ponents
- premature wear of the mechanical components (gaskets)
and of the user interface (display)
- reduction in performance, lifetime and possible damage of
the battery pack
• Always ensure that the flow of air around the inverter is not
blocked so as to prevent overheating.
• Do not install in locations where flammable substances or
gases may be present
• Do not install in locations with a constant presence of water and/or high humidity level.
• Do not install in rooms where people live or where the prolonged presence of people or animals is expected, because of the noise (around 50dB(A) at 1 m) that
the inverter produces during operation.
• Avoid electromagnetic interference that can compromise the correct operation of electronic equipment, with the consequent hazards
• The ambient temperature of the installation location must be between 5°C and 35°C to guarantee the optimal operation of the battery unit (REACT-BATT-AP1).
Here below are the functions available from the system on the basis of the ambient temperature:
T1 - Optimal operation of the REACT system
T2 - Correct operation of the REACT system with possible reduction in the lifetime of the batteries
T3 - Partial operation of the battery which limits its functioning to discharge only
T4 - Operation limited to the inverter part only. Management of the battery is disabled.
T4
T3
T2
-20
-10
0
+5
• Consult the technical data to check the required environmental conditions (protection rating, temperature, humidity, altitude, etc.)
Final installation of the REACT system must not compromise access to any externally located disconnection devices.
Please refer to the warranty terms and conditions to evaluate any possible warranty exclusions due to improper installation.
Installation position
When choosing the place of installation, observe the following conditions:
• Install on a wall or strong structure capable of bearing the weight of the
equipment
• Install in safe, easy to reach locations
• If possible, install at eye-level so that the display and status LEDs can be seen
easily
• Install at a height that considers the heaviness of the equipment. Failure to meet
this condition could result in problems during servicing, unless suitable means are
provided to carry out the operation
• Install vertically with a maximum inclination of 5° (forward or backward). If this
condition cannot be met, the inverter could undergo derating due to high tempe-
rature because of poor heat dissipation.
• The installation must take account of any electrical devices (e.g. lamps,
switches, etc.) which must be at least 60cm from the equipment. These distan-
ces must be maintained also to facilitate the circulation of the air needed to cool
the unit and to facilitate the operations to install/maintain hardware and software
which is done by dismantling the covers placed on the front.
• For a multiple installation, position the inverters side by side.
• If the space available does not allow this arrangement, position the inverters in
a staggered arrangement as shown in the figure so that heat dissipation is not
affected by other inverters.
7.
- Unscrew the 8 screws and open the front cover
11
in order to make all the necessary connections.
Warning! Dangerous voltage on the terminals of the power connector. Be careful not to touch the terminals with fingers or with uninsulated
equipment. Make the connections using personal protective clothing and/or equipment, such as insulating gloves.
- Insert the battery pack connection cables (which come out of the inverter) into the REACT-BATT
cover.
36
- Feed the cables into the cable conduit (male)
supplied with the REACT-BATT
36
14
- Insert the cable conduit (male)
into the REACT-BATT
Connect the cables to the respective counterparts on the battery pack respecting the positions:
a
Communication and control cable on the communication and control connector (cable from the unit on the right)
b
Power cable on the power connector (cable from the unit on the right)
c
35
Ground cable on the ground connection points
.
44
42
J7
BATTERY ADDRESS
SELECTOR
D1
D2
J
4
D3
120
J6
J5
ON
/ I
O
C
O
M
.
L
N I
K
M
U
L
T
- I
B
A
T
T
E
R
Y
BATT. COMM.
OFF
BATT. COMM.
BUS
BUS
- Before to close the front cover check that:
• the switch for setting the termination resistance of the internal communication line is in position OFF (downward)
• the rotary switch for setting the internal RS485 address is in position 1.
- Screw the 8 screws (tightening torque 2.4Nm) and close the REACT-BATT-AP1 front cover
- Refer to the REACT product manual for the commissioning of the system
Ø 6cm
60cm
2m
Ø 6cm
T1
T2 T3
T4
+35 +40 +45
+55
60
60
cm
cm
60cm
60cm
60cm
60cm
60
cm
60
cm
14
using the hole present on the side of the mechanical
14
.
07
and screw it into its counterpart (cable conduit (female)
on REACT-UNO
39
.
38
.
39
35
38
J1
PE
J
3
DC POWER
J2
b
/ I
O
C
O
M
.
a
MULTI-BATTERY
DC POWER LINK
c
11
.
7.
During installation, do not place the equipment with its front facing towards the ground.
Handling of the REACT inverter and of the Battery Box requires two people. Do not attempt to wall mount the system alone.
- Snatch off the adhesive on the hole on right lower enclosure's side.
- Hook the REACT-BATT-AP1 to the bracket springs in correspondence with the insertion points in the bracket
2). During this phase verify the correct alignment of the two unit (REACT-BATT-AP1 and REACT-UNO).
- Drill 2 holes in correspondence with the slots on the REACT-BATT lower bracket, using a drill with a 10 mm diameter bit. The holes must be approximately 70 mm
60cm
deep.
- Anchor the lower part of the REACT-BATT using No. 2 plugs with a diameter of 10 mm, supplied (Step 3).
60cm
60cm
3
>15m
°C
8.
The dimensions are expressed in millimeters (mm) and inches (in)
03
.
9.
Environmental
Ambient temperature range
Optimal battery operational temperature range
Full battery function operational temperature range charge
Full battery function operational temperature range discharge
Relative humidity
Recommended location
Physical
Environmental protection rating
Cooling
Battery unit dimension (H x W x D)
Battery unit weight
Mounting system
Battery pack
Manufacturer
Battery type
Typical/Max power discharge
Max power charge
Rated capacity
Battery lifetime
Battery calendar lifetime, typical
Safety
Marking
Safety and EMC
Contact us
www.abb.com/solarinverters
2
1
3
EN62109-1, EN62109-2, compliant with the applicable requirements of EN60950-1,
01
on the back of the equipment (Step 1 and
4 9 0 m
m -
1 9 . 3
"
REACT-BATT-AP1
-20...+55°C
+5...+35°C
0...+40°C
-10...+45°C
0...95% non condensing
Indoor with ventilation openings
IP21
Natural
740 mm x 492 mm x 231 mm
< 37 kg
Wall bracket
Panasonic
Li-Ion
1.5 kW / 1.8 kW
1.1 kW
2 kWh (6 kWh, with 3x battery pack)
> 4500 cycles
10 years ( Max 9 MWh discharged)
CE
EN61000-6-2, EN61000-6-3, UN38.3, UN3480
REACT-BATT-AP1-Quick Installation Guide EN-Rev A
EFFECTIVE 2016-10-01
© Copyright 2016 ABB. All Rights Reserved.
Specifications subject to change without notice.

Advertisement

loading