PEDROLLO DG PED 3 Instructions For Use Manual page 25

Automatic pressurisation system with inverter
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 18
Unscrew and remove the filling plug and the vent plug.
Pour in about 1.5 litres of water until it pours out of the
vent hole.
Rescrew the filling plug and the vent plug.
Open the water tap
SIMULTANEOUSLY press buttons
DG PED enters into a priming mode.
RED LED
FIXED
The priming procedure lasts at most 5 minutes, at the end of each minute DG PED automatically stops the electric pump
for five seconds then immediately restarts it. This is repeated for all the time the DG PED is priming. During this procedure
the LEDS will continue to flash.
The exit from the priming procedure can occur either because of time out (5 minutes) or because it is completed. The
LEDS stop flashing. If the pump does not prime repeat the operation from the start.
and
for 5 seconds.
GREEN LEDS
FLASHING
GREEN LED
FLASHING
Attach the plug to the electricity supply.
Turn the switch to "I".
Press button
to start priming.
GREEN LEDS
FLASHING
ENGLISH |
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dg ped 5

Table of Contents