Download Print this page

Unex Flow Cell Assembly Instructions

Advertisement

Quick Links

For detailed video installation instructions, please go to: www.unex.com/resources/video-library
A Flow Cell modular unit starts with a framework of vertical Posts & horizontal Beams (Flow Cell Structure)
bolted together with 3/8"-16 hardware (included)—only one wrench size (9/16") is required.
This base structure plus Span-Track carton flow track and any of several optional features
complete the Flow Cell assembly.
FLOW CELL STRUCTURE
Attach side Beams (2) to Posts (2) for each side of cell — one high, one low.
1
FlowCell with Tool Bar will have 2 longer posts at front. Note: Ensure foot
plates oriented in the same direction. If using rigid casters, align long
dimension of plates in direction cell is to roll.
Join the 2 sides by bolting on front
2
beams at discharge heights at front of
cell. For return lane front beam would
be at load height.
Bolt on rear beams for each level
3
approximately 1" higher per foot than
front beams. Recommended pitch is 1
inch for every 1 foot of rack depth.
4
Slip plastic End Caps onto posts.
FLOW CELL OPTIONS
CASTERS
Attach casters to
foot plates using
3/8" bolts. (provided)
http://www.youtube.com/watch?v=FmfHPMQroU4
WORKBENCH
Attach shelf brackets (2) to posts at desired height
using 3/8 bolts. Attach workbench, inserting 4
bolts from below.
http://www.youtube.com/watch?v=sJKyUwg0SmU
OVERHEAD TOOL BAR
Attach brackets (2) at top of front posts using 3/8"
bolts. Attach tool bar strut channel with 2 bolts
inserted from below, and 2 strut nuts.
http://www.youtube.com/watch?v=6fNYzAxCfww
ADD-ON TRAY
Attach tray brackets to tray. Hang back of tray
over front beam. Bolt brackets to posts. Attach
full-length Label Holder to front surface of
Add-On Tray using two-sided tape (provided
on back side of Label Holder).
Pick Smarter. Pick Better. Pick UNEX.
(all necessary brackets and hardware are included)
(video instruction hyperlinks below in text)
UNEX MANUFACTURING, INC.
50 Progress Place, Jackson, NJ 08527
800.695.SPAN (7726)
732-928-2800 • fax: 732-928-2828 • e-mail: span@unex.com • unex.com
ASSEMBLY INSTRUCTIONS
NOTE: Before
attaching side Beams,
determine front &
rear Beam positions
(be sure to consider
pitch), since side
Beams cannot share
Post locations with
front & rear Beams.
www.unex.com/resources/video-library

Advertisement

loading

Summary of Contents for Unex Flow Cell

  • Page 1 ASSEMBLY INSTRUCTIONS For detailed video installation instructions, please go to: www.unex.com/resources/video-library A Flow Cell modular unit starts with a framework of vertical Posts & horizontal Beams (Flow Cell Structure) bolted together with 3/8"-16 hardware (included)—only one wrench size (9/16") is required.
  • Page 2 INSTALLING SPAN-TRACK For detailed video installation instructions, please go to: www.unex.com/resources/video-library FlowCell™ framework (vertical Posts & horizontal Beams) accepts Cell Span-Track and High Profile Span-Track models. CELL SPAN-TRACK (LANE OR BED) Drop-in installation. Notched front end rests on beam. Flat plate at rear wraps over beam.