Smart Metals 172.0200 Mounting Instructions

Videowall, set of 2 mounting arms incl. alignment mechanism

Advertisement

MOUNTING INSTRUCTIONS 172.0200
INSTALLATIE INSTRUCTIES 172.0200
1
b
a
3
c
b
SmartMetals Mounting Solutions B.V. • Handelsweg 4 • 4231 EZ Meerkerk • The Netherlands • T +31(0)183352942 • F +31(0)183352909 • E info@SmartMetals.eu
VideoWall - Set of 2 mounting arms incl. alignment mechanism
VideoWall – Set van 2 schermverbinders incl.afstelmechanisme
2
H = Height screen + clearance
4
d
English
1. Slide the slot nut (a) in the slot of the aluminium
profile. Then place a wall bracket on both sides
of the profile and fasten them using bolt (b). Then
divide the other brackets evenly (L) along the profile
and fasten them using bolt (b).
2. Calculate the distance for the assembly of the
second profile (H) as follows: H = screen height +
desired clearance between the screens (usually
1mm)
3. When the profiles are mounted to the wall, check
distance (H) and make sure the profiles are levelled
(horizontally as well as vertically). If necessary,
loosen the bolts (b) and (c) to adjust the profiles.
Don't forget to tighten the bolts again.
4. Position the delivered plate bearings (a) as shown
with arrows, do this by slightly squeezing them and
pushing them in the hole.
Nederlands
1. Schuif de gleufmoer (a) in de sleuf van het
aluminium profiel. Plaats de muurbeugeltjes aan
weerszijden van het profiel en zet ze vast met bout
(b). Verdeel de tussenliggende muurbeugeltjes
gelijkmatig (L) over het profiel en zet deze vast met
bout (b).
d
M8 (4x)
2. Bereken voor de montage van het tweede profiel
de afstand tussen de profielen (H) als volgt:
H = schermhoogte + gewenste speling tussen de
schermen (meestal 1mm).
3. Als de profielen aan de wand zijn gemonteerd,
controleer dan afstand (H) en of de profielen
(zowel horizontaal als verticaal) waterpas zijn. Door
de bouten (b) en (c) van de muurbeugels te lossen,
is het profiel te stellen. Vergeet de bouten niet weer
aan te draaien.
4. Plaats de meegeleverde plaatlagers (d) zoals
met de pijlen hiernaast is weergegeven, door ze iets
in te knijpen en in het gat te drukken.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 172.0200 and is the answer not in the manual?

Questions and answers

Summary of Contents for Smart Metals 172.0200

  • Page 1 MOUNTING INSTRUCTIONS 172.0200 VideoWall - Set of 2 mounting arms incl. alignment mechanism INSTALLATIE INSTRUCTIES 172.0200 VideoWall – Set van 2 schermverbinders incl.afstelmechanisme English 1. Slide the slot nut (a) in the slot of the aluminium profile. Then place a wall bracket on both sides of the profile and fasten them using bolt (b).
  • Page 2 MOUNTING INSTRUCTIONS 172.0200 VideoWall - Set of 2 mounting arms incl. alignment mechanism INSTALLATIE INSTRUCTIES 172.0200 VideoWall – Set van 2 schermverbinders incl.afstelmechanisme English M6x12 (4x) M8x20 (4x) 5. Fasten from the two mounting arms, screen M8 (20x) M8x14 (4x) profiles (B) to the back side of the screen;...
  • Page 3 MOUNTING INSTRUCTIONS 172.0200 VideoWall - Set of 2 mounting arms incl. alignment mechanism INSTALLATIE INSTRUCTIES 172.0200 VideoWall – Set van 2 schermverbinders incl.afstelmechanisme English 9. Place the screen in the center of the aluminium profile. 10. By turning the adjusting bolts (m) in or out, the screen can be levelled horizontally.

Table of Contents