Components are installed with recommended hardware and
tightened securely.
All mounting holes and access holes are sealed with
neutral/alcohol cure silicone sealant.
All covers, guards or screens are installed securely on unit.
Evaporator drain hoses are angled downward for proper
drainage.
Drain hose heaters (if applicable) are installed correctly.
The orifice screen is installed in the expansion valve at the
evaporator.
In-cab controller installed and is accessible and visible from
the driver's position.
Refrigerant hoses are not taut - they are able to absorb
vibrations.
Refrigerant hoses are not rubbing against moving
components, sharp objects, or items that can reach high
temperatures.

Installation Check List

Compressor was filled with the proper amount and type of oil.
All electrical connectors are properly locked in place.
Standby Power Receptacle mounted securely to vehicle.
All electrical harnesses and wiring is routed and secured
adaquately.
Correct size and amperages fuse was installed in the main
power harness to the battery.
Maxi Fuse holder was secured properly with bolt and nut to
vehicle.
All battery connections are clean and tight.
Vehicle compressor drive kit test was carried out.
Complete refrigeration system was checked for leaks.
Unit is charged with correct type and amount of refrigerant.
SPR and CPR adjustment procedures were carried out and
unit operates at its maximum capacity.
Unit operates correctly.
P-Trap installed correctly.
Compressor ground strap installed.