LANDMARK PAVILLION ASSEMBLY GUIDE
Thank you for choosing Pergola Kits USA Inc.
Easy step-by-step instructions
Helpful Hints
Tools and hardware list
Easy to follow drawings
Visual Illustrations
Hardware List / Tools Required
Pavilion Parts
Post Placement / Bracket Pre-assembly
Concrete / Deck / Patio Paver Application
Post Trim / Beam Installation
Roof Plate Installation
Rafter Installation
Sheathing Installation
Roofing Material Installation
Trim Installation
Warranty Information
4 Posts
Pg. 1
Pg. 2
Pg. 3
Pg. 4
Pg. 5
Pg. 6
Pg. 7
Pg. 8
Pg. 9
Pg. 10
Pg. 11

Advertisement

loading

Summary of Contents for Pergola kits USA LANDMARK PAVILLION

  • Page 1 4 Posts LANDMARK PAVILLION ASSEMBLY GUIDE Thank you for choosing Pergola Kits USA Inc. Pg. 1 • Hardware List / Tools Required • Easy step-by-step instructions Pg. 2 • Pavilion Parts Helpful Hints • Pg. 3 • Post Placement / Bracket Pre-assembly Pg.
  • Page 2 Hardware Concrete Lag For Anchor Bracket 3/16" X 2 1/2" Wood Screw 3/8" X 3" Concrete Lag ( For Concrete Applications Only ) 5/8" Metal Roofing Screw 3/16" X 3" Wood Screw Wood Lag For Anchor Bracket 3/8" X 3" Wood Lag ( For Deck Applications Only ) Wood Lag For Anchor Bracket 2x10 Plat Bracket...
  • Page 3 Pavilion Parts Pavilion Parts Quantity Shingle Post Caps Shingles Shingle Metal Pavilion Size Rafters Sheathing Metal Hip Cap Posts Beams Rof Plates Drip Edge Starter (Bottom) (bundles) Ridge Cap (Pieces) Strips 10 x 10 10 x 12 10 x 14 10 x 16 12 x 12 12 x 14...
  • Page 4 Post Placement Layout Step 1 Post Layout Measurments Pavilion Size Center to Center Diagonal 10 x 10 9'-5 1/4" X 9'-5 1/4" 13'-4" 10 x 12 9'-5 1/4" X 11'-5 1/4" 14'-9¾" 10 x 14 9'-5 1/4" X 13'-5 1/4" 16'-5"...
  • Page 5 Fastening Posts To Concrete Step 3 Using a hammer drill with a 3/8" concrete bit, drill holes 1/2"deeper Fasten Posts to concrete slab useing type than the length of the type (T) lag. (T) concrete lags. Note: Be Sure to plum all of the posts.
  • Page 6 Step 4 Post Trim Installation Install post trim by sliding them down over the posts. Beam Installation Step 5 Install beams using 7- type (W) #8 x 3" screws at each end of each beam NOTE: Keep beams flush with top of posts and c enter beam on posts pergolakitsusa.com...
  • Page 7 Step 6 Roof Plate Installation Fasten the plates on top of the beams using type (U) 2 1/2" screws, keep the side of the plate flush with the center mark on the beam and the diagonal line drawn from corner to corner of posts. Step 7 pergolakitsusa.com...
  • Page 8 Step 7 Rafter Installation Install rafters at premarked locations, fasten with 4 -Type (W) screws at the bottom of each rafter and 2 screws at the top of the rafters Rectangular roofs will have a ridge pole Rafter Installation (Cont.) Step 8 Install corner rafters at premarked locations, fasten with 4 -Type (W) screws at the bottom...
  • Page 9 Step 9 Rafter Installation (Cont.) Install the rest of the rafters at premarked locations, fasten with 4 -Type (W) screws at the bottom of each rafter and 2 screws at the top of the rafters Sheathing Installation Step 10 Install the 1x6 Sheathing, keep the first piece flush with the fascia and fasten with 1 1/2"...
  • Page 10 Step 11 Drip Edge Installation Install Drip Edge along the bottom edge of the roof Metal Roofing Installation Step 12 Install the metal roofing panels using type (X) metal screws Screw beside each rid along the bottom and the top of each panel and beside every other rib throughout the center of the panels approximatly 2' apart Keep bottom edge of metal panels 1"...
  • Page 11 Step 13 Hip Cap Installation Install the hip cap using type (X) metal screws Screw the hip cap to the metal roofing at each rib The hip caps are cut and bent to fit at the bottom of each piece but they will need to be cut to length .
  • Page 12 Congratulations! Enjoy your Landmark Pavilion with friends and family for years to come. pergolakitsusa.com...