Page 4
6. Ensure operation as per Altron operating procedure 7. Ensure a minimum of 3 turns of cable on the winch drum before winch takes load. 8. IF IN DOUBT ASK (Call Altron technical on +44 (0) 1269 831431 or e-mail cctvsales@altron.co.uk Winch inspection and maintenance Carry out the following checks and maintenance at least annually.
Need help?
Do you have a question about the ACC1 and is the answer not in the manual?
Questions and answers