Packing List; Attention - Acer GOM Series User Manual

Outdoor gateway
Table of Contents

Advertisement

        

Packing list

Attention

1. Gateway should be installed in the place with at least 20 degrees of depression angle to
building edges, and with at least 50cm clearance when installed at the side of a building
wall.
2. LoRa Omni directional antenna should be as far as possible from the other antennas,
and should be lower than the highest elevated point of the building.
3. The antenna should be installed vertically to the ground to achieve good effect.
4. Do the protection of lightning protection for gateway equipment, access network cable of
gateway, gateway antennas(surge arrester/lightning protector), and make sure the
antenna with the feeder to be connected to ground.
5. Using low power consumption RF coaxial cable of the feeder, as short as possible.
ACER Being Communication Inc.