Download Print this page

Installation; Preparing For Installation - Riello Socle Box Installation Manual

Advertisement

P
REPARING FOR INSTALLATION
With the UPS positioned on top of the pallet, and referring to the picture below, proceed as follows:
A – Move the UPS slightly backward (being careful not to exceed the limit of the pallet) in order to free up
the space required to secure the slides supplied along with the UPS:
B – Turn the slides over so the their sides are facing upward, as shown in the figure. Secure the ends of
the slides to the pallet using the screws supplied along with the UPS.
C – Secure the other 2 ends of the slides to the Socle Box using the 4 black M4x8 screws supplied.
4

INSTALLATION

Advertisement

loading