Download Print this page

Pentair Hoffman IW4000 Manual page 4

Ir window

Advertisement

De-burr the holes; remove any shavings and the
STEP
7
self-adhesive template
Degrease the front panel.
Fix infrared window
STEP
8
Align the fixing holes and firmly press the Infrared
Window into place.
With the correct sized screwdriver and three of the four
countersunk screws supplied, fix the window to
the panel.
Gradually advance each fixing until to torque setting
between 0.5 – 1 lbf.ft (0.68 – 1.36 N.m) is achieved and
units are secure.
Usage notes
To maintain enclosure type rating, viewport cover must be secured in place.
All Pentair trademarks and logos are owned by Pentair or its global affiliates. Pentair reserves the right to
change specifications without prior notice.
© 2014 Pentair.
- 4 -
© 2014 Pentair Equipment Protection
STEP 7
STEP 8
PH 763 422 2211
pentairprotect.com
89116261

Advertisement

loading