Main unit
3-35
9
Front cover assembly (assembling the operation PCB holder)
1. Attach the rubber keys 1 to the operation PCB holder 2.
2. Attach the VR key tops 3 (two) and key top rear plate 4 to the operation
PCB holder 2.
• Attach the operation F0 PCB assy. 5 using the screw 1 (four).
1
3 - 2
Main parts
Taptite, Bind B
M3X8
Color; Gold
Torque
·
0.57 – 0.78 N
m
3
4
2
1
5
1
1