Download Print this page

Bettersafe Walk Angel Installation, Technical And Maintenance Manual

Hide thumbs Also See for Walk Angel:

Advertisement

Quick Links

Installation,
Technical
and
Maintenance
Manual
June2016
Revision 1.2
Installation Manual
June 2016: rev 1.2

Advertisement

loading
Need help?

Need help?

Do you have a question about the Walk Angel and is the answer not in the manual?

Questions and answers

Summary of Contents for Bettersafe Walk Angel

  • Page 1 Installation, Technical Maintenance Manual June2016 Revision 1.2 Installation Manual June 2016: rev 1.2...
  • Page 2: Table Of Contents

    It is designed for use on roofing areas and raised platforms for access to areas of buildings and structures that are deemed unsafe to do so otherwise. The Walk Angel Walkway System is not designed for use as an attachment point for fall protection PPE.
  • Page 3: Maintenance

    Maintenance • Periodic inspections by a competent person are recommended by the manufacturer. In UK/Europe these are required under Regulation 5 of the Workplace (Health, Safety & Welfare) Regulations, the Work at Height Regulations. • The frequency will depend upon the environment, location and usage but should be at least every 12 months.
  • Page 4: Installation On Profiled Type Roof Sheet

    2. uPVC Walk Angel Boards are mounted in the “short” orientation between the beams, in line with the profile. 3. The beams shall then be fixed to the crowns...
  • Page 5: With The Profile

    2. uPVC Walk Angel Boards are mounted in the “long” orientation between the beams, in line with the profile. 3. The beams shall then be fixed to the crowns...
  • Page 6: Installation On Standing Seam Type Roof Sheet

    2. uPVC Walk Angel Boards should be mounted in the “short” orientation between the beams, in line with to the profile. 3. The beams shall then be fixed to support ‘L’...
  • Page 7: With The Profile

    2. uPVC Walk Angel Boards should be mounted in the “long” orientation between the beams, in line with the profile. 3. The beams shall then be fixed to support ‘L’...
  • Page 8 Installation on flat roofing 1. uPVC Walk Angel Boards should be mounted in the “long” orientation. 2. In the two outer boards lengths of 23mm Stainless Steel Round Bar is inserted to provide ballast. 3. The weighted sections should be separated by a non-weighted section.
  • Page 9 Supports 1. I-Beams made from extruded plastics 2. Levelling using I-Beams are manufactured per installation based on the roof pitch as specified by the customer. Installation Manual June 2016: rev 1.2...
  • Page 10 Steps 1. Steps shown are for illustration purposes only 2. Steps are fabricated to suit individual profiles of roof. Installation Manual June 2016: rev 1.2...
  • Page 11 Fixings Tek Screw Standing Seam Clamp Installation Manual June 2016: rev 1.2...
  • Page 12 Fixings Joiner Installation Manual June 2016: rev 1.2...
  • Page 13 Riverside Mountbatten Way Congleton Cheshire CW12 1DY United Kingdom t | + 44 (0) 1260 217 437 NETHERLANDS Azewijnseweg 12 SF 4214 KC Vuren The Netherlands t | + 31(0) 183 820 280 info@bettersafeinternational.com www. bettersafeinternational.com Installation Manual June 2016: rev 1.2...