Download Print this page
Sime Dewy Equipe P100 Box Installation And Servicing Instructions
Sime Dewy Equipe P100 Box Installation And Servicing Instructions

Sime Dewy Equipe P100 Box Installation And Servicing Instructions

Pre-mixed condensation heating modules
Hide thumbs Also See for Dewy Equipe P100 Box:

Advertisement

Quick Links

PLEASE LEAVE THIS INSTRUCTION
UK
WITH THE USER
Dewy Equipe Box
P100-P600
Installation and
servicing instructions

Advertisement

loading
Need help?

Need help?

Do you have a question about the Dewy Equipe P100 Box and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sime Dewy Equipe P100 Box

  • Page 1 PLEASE LEAVE THIS INSTRUCTION WITH THE USER Dewy Equipe Box P100-P600 Installation and servicing instructions...
  • Page 2 All descriptions and illustrations provided in this manual have been carefully prepared but we reserve the right to make changes and improvements in our products that may affect the accuracy of the information contained in this manual.
  • Page 3 IPX4D CONTENTS DEVICE DESCRIPTION ........................... pag. INSTALLATION ............................... pag. 12 FEATURES ..............................pag. 20 USE AND mAINTENANCE ..........................pag. 23 Important Information IT IS A STATUTORY REQUIREMENT THAT ALL GAS APPLIANCES ARE INSTALLED BY COMPETENT PERSONS, IN ACCORDANCE WITH THE GAS SAFETY (INSTALLATION AND USE) REGULATIONS (CURRENT EDITION). The manufacturer’s instructions must not be taken as overriding any statutory requirements, and failure to comply with these regulations may lead to prosecution.
  • Page 4: Device Description

    DEVICE DESCRIPTION INTRODUCTION les intended only for heating, inter-con- They are designed and constructed to nectible and easy to assemble, designed meet European directives 92/42/CEE, “DEWY EQUIPE P100-P600 BOX” are to work singularly or in sequence/casca- 2009/142/CEE, 2014/30/UE, 2014/35/UE. de automatically. pre-mixed condensation heating modu- DImENSIONS mODULES 1.2.1...
  • Page 5 1.2.2 “DEWY EQUIPE P300-P400 BOX” D EW Y E QUIPE P 300 BOX 1730 FIXTURES System supply (Flange PN6-DN100) System return (Flange PN6-DN100) Gas (Flange PN6-DN50) S3 Condensate drain ø 40 D EW Y E QUIPE P4 00 BOX 2200 NOTE: The hydraulic separator is designed to be assembled on the left or right hand side by moving the blind flanges of the supply/return manifolds.
  • Page 6 1.2.3 “DEWY EQUIPE P500-P600 BOX” DEWY EQUIPE P500 BOX 2830 1090 FIXTURES System supply (Flange PN6-DN100) System return (Flange PN6-DN100) Gas (Flange PN6-DN50) S3 Condensate drain ø 40 DEWY EQUIPE P600 BOX 1090 3300 NOTE: The hydraulic separator is designed to be assembled on the left or right hand side by moving the blind flanges of the supply/return manifolds.
  • Page 7 TECHNICAL SPECIFICATIONS DEWY EQUIPE P100 BOX P200 BOX P300 BOX P400 BOX P500 BOX P600 BOX Nominal heat output (80-60°C) 94.9 189.8 284.7 379.6 474.5 569.5 Nominal heat output (50-30°C) 103.4 206.8 310.2 413.6 517.1 620.5 Minimum heat output G20 (80-60°C) 29.3 29.3 29.3...
  • Page 10 OPERATING DIAGRAm 1 Hydraulic separator (optional) 5 Condensate trap 6 Gas valve 8 Fan 9 Heating probe (SM) 10 Safety thermostat 95°C 11 Exhaust thermostat 12 Primary exchanger 13 Diaphragm 14 Differential pressure switch 15 Water pressure transducer 16 Air escape valve 17 Non return valve 18 Distributor 22 3-way drain valve...
  • Page 11 mAIN COmPONENTS 1 System return manifold 2 Gas manifold 3 Gas isolation valve 4 System supply manifold 5 Gas isolation valve 6 Fan 7 Ignition electrode 8 Ionisation electrode 9 Ignition transformer 10 Exhaust thermostat 11 Control panel 13 Air pressure switch 14 Heating probe (SM) 15 Safety thermostat 95°C 16 Differential pressure switch...
  • Page 12: Installation

    INSTALLATION The boiler must be installed in a fixed Installed in a room Installed in a compartment or enclosure location and only by specialized and quali- High level (within 15% of the room height High level (within 15% of the room height fied person in compliance with all instruc- from ceiling) - 2 cm /KW of net heat...
  • Page 13 CONNECTING UP SYSTEm sate, copper or steel is NOT suitable. It should be noted that the connection of a Before connecting the boiler it is recom- condensate pipe to a drain may be sub- ject to local building control require- mended that the system be flushed in accordance to BS 7593, to eliminate any ments.
  • Page 14 DEWY EQUIPE P300-P400 BOX - Right side exhaust manifold kit ø 200 DEWY EQUIPE P300-P400 BOX - Left side exhaust manifold kit Fig. 5/b...
  • Page 15 DEWY EQUIPE P500-P600 BOX - Right side exhaust manifold kit ø 250 DEWY EQUIPE P500-P600 BOX - Left side exhaust manifold kit Fig. 5/c...
  • Page 16 manifold positioned both on the module’s The kit code 8101533 supplied as option for – Expansion vessel 8 liters code 6245108, “DEWY EQUIPE P500-P600 BOX”, can be right and left and the use of extensions, connection pipe code 6227661, gaskets supplied separately.
  • Page 17 “DEWY EQUIPE P500 - P600 BOX” DEWY EQUIPE P600 DEWY EQUIPE P500 �� �� �� �� �� �� BOILER 1 BOILER 2 BOILER 3 BOILER 1 BOILER 2 BOILER 3 R3 604 Ohm resistance (1) NOTE: To connect other accessories to Live R4 649 Ohm resistance (1) Neutral...
  • Page 18 NOTE: must be ordered from SIME. 230V – 50 Hz Sime declines all responsibility for inju- single phase voltage is required using a ry or damage to persons, animals or...
  • Page 19 2.8.2 “DEWY EQUIPE P200-P300-P400-P500-P600 BOX” sequence/cascade electrical connections Modules are electrically connected to the terminal board in the shunt box. Insert the rubber pipe of the module that has to be con- nected into the corresponding hole on the box wall. Fix the rubber pipe to the internal wall of the box using the straps provided.
  • Page 20: Features

    FEATURES ELECTRONIC BOARD – “POT. ACC.” trimmer (6 fig. 13) ses. Each time the boiler restarts, Trimmer to vary the gas valve ignition after the slow ignition, for about 1 Built according to Low Voltage direc- pressure level (STEP). According to minute it will run at minimum modu- the type of gas the boiler is designed lation pressure before moving to the...
  • Page 21 TABLA 1/a (Transducer) CONNECTIONS – Ignition electrode does not spark Pressure Resistance (Ω) For the “DEWY EQUIPE P100 BOX” heat The gas valve operates and after 10 (bar) min. max. seconds the boiler locks out. module use a separate electrical line...
  • Page 22 CIRCUITO CON VALVOLE DI ZONA CIRCUIT WITH ZONE VALVES COPERTURA COVER ( 5 ) ( 6 ) SONDA HOT WATER NOTA: I relé vengono impiegati solo nel caso NOTE: Relays are only used when zone valves SANITARIO PROBE SB ( 11 ) le valvole di zona siano prive di micro.
  • Page 23: Use And Maintenance

    (chimney sweep). working gas supply pressure. If required flue gas analyser and the interpreta- Record the measurements from the flue contact Sime Ltd for further assistance. gas analyser = maximum output. tion of the results. DEWY EQUIPE P200 BO...
  • Page 24 SINGLE mODULE CALIBRATIONS GAS CONVERSION connections using soapy water or appropriate products. DO NOT USE NAKED FLAMES. – Close the gas cock. – Stick onto the casing panel the – Replace the injector (pos. 30) plate showing the relevant fee- and the relevant gasket (pos.
  • Page 25 GAS VALVE DUNGS GB-GD 057 Each single module is mass produced with gas valve model DUNGS GB-GD 057 (fig. 16). ROUTINE SERVICING AND REPAIR General PLEASE NOTE: During routine servicing, and after any maintenance or change of part of the combustion circuit, the fol- lowing must be checked: –...
  • Page 28 Sime Ltd 1a Blue Ridge Park Thunderhead Ridge Glasshoughton, Castleford, WF10 4UA Phone: 0845 9011114 Fax: 0845 9011115 www.sime.co.uk Email: enquiries@sime.co.uk...