BEFORE YOU START
Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information,
contact Stratco for advice. Before starting, layout all components and check them against the delivery docket. The parts description identifies each key part,
and the component layout diagram indicates their fastening position.
Double check all dimensions, levels and bolting locations before cutting, screwing or bolting structural members. It is recommended that the installers erecting
the structure have had some previous building experience because some modifications to the existing house structure may be required. If a freestanding unit
is being installed, the attachment beam becomes the rear fascia beam and is installed as per the details for the front fascia beam. Box gutters and flashings do
not need to be pre-fixed until all beams have been erected.
TOOLS REQUIRED
Drill and Hex-Head Adaptor
Rivet Gun
Tape Measure
Tin Snips
Spirit Level
Note: All screws within the unit must be fastened by hand using a screw-driver, or a low-torque, low-speed drill.
Using a powered tool may result in screw heads shearing from the shank. If screw heads shear from shank it is recommended
that a Screw Extractor kit is used to remove the screw.
Note: Allure components are designed for 1° fall to accommodate the minimum required louvre fall and Allure
construction should allow for this. A minimum 1:200 fall shall be maintained during construction for gutter fall toward
INSTALLATION GUIDE
Post Hole Digger
Silicone Gun
Spanners or Ratchet
Adjustable Construction Props
Concrete
downpipes when this is perpendicular to louvre direction.
Ladder
Vise Grips
Countersinking Drill Bit
Phillips-Head Screwdriver
Hole-Saws (ø13mm & ø16mm)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ALLURE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Stratco ALLURE

  • Page 1 Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information, contact Stratco for advice. Before starting, layout all components and check them against the delivery docket. The parts description identifies each key part, and the component layout diagram indicates their fastening position.
  • Page 2 M16 Dome Nut M8 Nut, M8 Washer Actuator M16 Hex Nut Shoulder Bolt M8x10x20 MOUNTING BUSH CABLE GROMMETS LINK PINS LINK ROD & LINK ROD ALLURE BEAM SPACER JOINER LINK ROD FLASHING CLOSING-UP COVER CLOSING-DOWN COVER DOUBLE-BEAM COVER FLASHING FLASHING FLASHING...
  • Page 3: Component Layout

    Cable Grommets Mounting Bush ADDITIONAL ITEMS Actuator Drive Assembly Please note that your Stratco Allure kit does not include any brackets or Remote Control fixings to attach the unit to an existing structure, or concrete/masonry Electronic Control Box anchors for the column installation. If required, they must be purchased Actuator as additional items.
  • Page 4 Standards. For more information regarding the suitability of the house structure Attachment Beam to accommodate the Allure Louvre Patio, consult a structural engineer or a building authority. It is the builder’s responsibility to ensure that the existing house roof structure is strengthened correctly.
  • Page 5: Framework Assembly

    FRAMEWORK ASSEMBLY Note: Please ensure to follow the site plans supplied to ensure the mounting beams are installed in the correct orientation. The Datum end of beams will be identifiable by Gutter measuring the first mounting hole centre 270mm in from the end of the beam (Figure 2.0 &...
  • Page 6 Fascia beam Side beam 50mm 60mm 30mm 10gx30 stainless steel Corner countersunk screws Knuckle 10g x 30mm stainless steel Corner Joiner countersunk screws Figure 2.7 Figure 2.10 Fascia Beam Attachment Header Beam assembly For units attached at the eaves, the Fascia beam is secured to the structure using Eaves Fixing Brackets.
  • Page 7: Post Installation

    Figure 2.14 POST INSTALLATION 100x100 SHS Posts are used to support the Allure framework. Once the framework is Fix the Post-to-Beam Bracket to the post using 10gx30mm stainless steel countersunk assembled and set at the correct pitch, the post height measurements must be taken.
  • Page 8 FOOTING INSTALLATION Into Concrete Footings Onto Concrete Footings If fixing the columns into the ground, dig the holes to the specified size. Place a half brick Where posts are fixed onto concrete a Post Shoe will be used. in the bottom of the hole (Figure 4.0). Measure from the underside of the beam to the Fix the Post Shoe to concrete using one M12x120mm Anchor Bolt in conjunction with top of the half brick and cut posts to this length at each post location.
  • Page 9: Electronic Control Box

    The location of the actuator in relation to the opening direction of the louvres will dictate whether a Type-A or Type-B actuator kit is provided. Spring The appropriate orientation has been determined by Stratco, based on the opening direction of the louvres relative to the intended motor location. Spring bush Attach the adjustment bolt to the other end of the actuator with an M8x10x20 shoulder bolt (Figure 6.3).
  • Page 10 PREPARING LINK RODS Lay the link rods on the ground, taking care not to bend them. The short angle should be Thread nut approx. 20mm facing upwards. Determine where the link rod needs to be cut by counting the number 90°...
  • Page 11: Using The Remote Control

    Plug the 2 pin cable end into the control box and turn the power on. USING THE REMOTE CONTROL The remote control provided is used to control all Allure banks within the unit. In units with multiple banks the two round buttons on the remote control are used to select the appropriate bank channel.
  • Page 12: Rain Sensor

    Ensure any excess rain sensor cable is not rolled into a coil as this can cause false triggers of the rain sensor. The rain sensor cable should also be kept away from all power 12x20 Self-drilling screws with cables as the induced voltage can also cause false triggers of the rain sensor. neo washers along length Due to the sensitive nature of the sensor, it is likely that on occasion, small creatures, Double-Beam...
  • Page 13: Troubleshooting

    TROUBLE-SHOOTING PROBLEM CHECK POSSIBLE CAUSE REMEDY Replace battery in the remote Flat battery in remote control unit. The red LED light on the remote control unit with new CR3032. control unit should illuminate when Replace the entire controller any of the buttons are pressed. Faulty remote control unit.
  • Page 14 QUEENSLAND • NEW SOUTH WALES • VICTORIA AUSTRALIAN CAPITAL TERRITORY • SOUTH AUSTRALIA stratco.com.au WESTERN AUSTRALIA • NORTHERN TERRITORY All brands and logos/images accompanied by ® or ™ are trade marks of Stratco (Australia) Pty Limited. ® Copyright June 2019...

Table of Contents