Table of Contents

Advertisement

Available languages

Available languages

PREPARING FOR USE
Leave the device in an upright position for at least 2 hours before starting it up for the first
time and make sure the condensation outlet is well sealed.
Place the device on a level surface close to a window and a grounded outlet.
It must be at least 50 cm away from walls and other objects.
Prior to using the device make sure that both air inlet and air outlet are free from items
and not blocked.
Observe the instructions in the chapters "Important information on safety, location and
electrical connection".
INSTALLATION
You can start your air conditioning unit up after following a few simple steps:
1. Installing the air hose on the device
Screw the air hose into the designated
opening on the back of the device.
2. Installation close to a window /
balcony without window mount
Now place the air conditioning unit close
to a window or a balcony door.
Adjust the length of the hose in such a
way that it reaches the window / balcony
door.
Make sure the air can flow freely through
the hose.
Open the window a bit and attach the air
hose taper there.

STARTUP

IMPORTANT!
Seite 23 von 34

Advertisement

Chapters

Table of Contents
loading

Related Products for Schuss SHE SHE9KL2001F

Table of Contents