Checking the chains and hook ................8 Maintenance ......................10 Lubrication specification ..................10 Technical data ......................11 VII. Spare parts for Pullmaster-II chain hoist .............12 VIII. Spare parts list for Pullmaster-II chain hoist ............13 Annual checks for statutory accident prevention ..........19 CE DECLARATION OF CONFORMITY ................20...
SAFETY INSTRUCTIONS Read the manu- NEVER lift NEVER lift NEVER pull NEVER an excessive over people! the chain operate the load! across sharp equipment edges! when it is defective! NEVER carry NEVER throw NEVER use NEVER work 10. NEVER attach people! the hoist the load chain...
I. General These operating and maintenance instructions are intended to provide you with important instructions for the safety and reliability of your chain hoist. They are not a substitute for the industrial safety regulations and the accident prevention regulations issued by the employer’s liability insurance associations and the many standards, which may differ in the respective countries.
III. Particular safety instructions Certain work and activities are not allowed whilst using the chain hoists, because it is dangerous to life and can cause injuries and damage to the machine, e.g.: – You must read the operating manual before commissioning –...
B. Testing before each use – Hang the chain hoist with the hook in the support structure and turn once. – The hand chain and load chain must hang down freely without any bends or twists. – Pull the hand chain all the way through once. –...
V. Inspections, repair and maintenance Regular visual inspection must be carried out by authorised, trained personnel according to the legal regulations. Also pay attention to any unusual working noises! Additional inspection: more than one visual inspection is required for the braking system.
Page 9
Max. measurement over Load Min. chain link bearing 1 chain link 11 chain links diameter (D) capacity 0.5 t 15.5 mm 170.5 mm 4.5 mm 1 t & 2 t 18.6 mm 204.7 mm 5.4 mm 1.5 t & 3 t 24.8 mm 272.8 mm 7.2 mm...
Measurement must be carried out as follows: – Measure from metal to metal in the hook opening, not including the hook safety catch. – The abrasion of the hook surface must not exceed 10 % of the actual value. – Determine the lateral torsion of the hook! In the event of twisting that exceeds 10 degrees beyond flatness, the hook must be replaced.
VI. Technical data TYPE PULLMASTER-II ... Load bearing capacity Standard lift Min. height (A) Hand chain pulling force 26.2 32.4 40.2 43.8 Hand chain operating length Reel path for 1m lift 25.52 41.48 44.79 44.79 82.95 89.59 154.86 Number of chain falls...
IX. Annual inspections for statutory accident prevention Name/signature Type of test Test date Findings of the tester...
Page 21
Declaration of Conformity according EG-Machine Directive 2006/42/EG Annex VII A PLANETA-Hebetechnik GmbH, Resser Strasse 17, D-44653 Herne declare that the hereafter named product, in its conception and design as well as in the from us released version, is in its standard setup intended for the purpose of lifting and lowering of loads and including a load test, corresponds to the fundamental health and satefy regulations of the EG-Machine directive.
Need help?
Do you have a question about the Pullmaster-II and is the answer not in the manual?
Questions and answers