Page 1
Mobile Base Assembly Guide 1300 802 960 | www.spectur.com.au...
Page 2
Spectur Guide for STA6 Installation Contents Getting Started ..........................2 What you need ..........................2 Step 1: ............................. 2 Step 2: ............................. 3 Step 3: ............................. 3 Step 4: ............................. 4 Getting Started What you need ○ 40 x M5x10 Screws ○...
Page 3
Spectur Guide for STA6 Installation Step 2: Using 10 M5x10 screws on each of the sides, secure the side panels to each side of the mobile base frame. Step 3: Apply Warning sticker to each side of the mobile base. Ensure when applying the sticker that the sticker is has no bubbles and is parallel to the top of the base.
Page 4
Spectur Guide for STA6 Installation Step 4: Apply a Spectur sticker to each of the pyramid sides. Use a spray bottle to lubricate the sticker and the pyramid side. Use a squeegee to remove bubbles from the sticker. With the completion of this step the mobile base is ready to be used for installations. For information on how to conduct installations with the mobile base refer to either the HD5 installation manual or the STA6 installation manual.
Need help?
Do you have a question about the STA6 and is the answer not in the manual?
Questions and answers