Download Print this page

Commissioning - Mandik M Series Installation, Commissioning Maintenance

Air conditioning units

Advertisement

KJM MANDÍK Installation, Commissioning, Maintenance
Each connection of the two chambers must be additionally sealed inside with a special
sealant from the mounting kit, see the following figure. The sealant must be certified
according to VDI 6022 for microbial inertness according to the ISO 846 standard
(method A + C) !!!
before applying

3 COMMISSIONING

First, all commissioning instructions according to the general AHU installation manual
must be observed!
• before commissioning, an initial hygiene inspection shall be carried out in
accordance with VDI 6022, Blatt 1, Section 7. This inspection is focused on
compliance with the design requirements in accordance with VDI 6022, Blatt 1,
Section 6.
• before commissioning the intended air filters properly shall to installed
• before commissioning, check that all inspection and cleaning openings and drains
for cleaning are securely sealed. All condensate drains shall be tested with a
IZU 1.0 01/2021
seal around the perimeter of the chamber
use a cover ledge in the case of two
neighboring condensate tray !
after applying
MANDÍK, a.s., www.mandik.cz
R
6

Advertisement

loading

This manual is also suitable for:

P seriesT seriesM + series